Opportunity
PIEE #W911S226U4505
Procurement of 10 Automated 3D Digital Footwear Fitting Systems and Annual Technical Service
Buyer
MICC-Ft Drum
Posted
September 15, 2026
Respond By
September 17, 2026
Identifier
W911S226U4505
NAICS
423450, 334118, 339999, 541512
This opportunity is for the procurement of Automated 3D Digital Footwear Fitting Systems and annual technical service for military recruit processing at Fort Jackson, SC. - Government buyer: W6QM MICC-FT DRUM (Leaders Training Brigade, Fort Jackson) - Request for ten (10) commercial-off-the-shelf, brand-agnostic Automated 3D Digital Footwear Fitting Systems - Systems must use non-invasive optical or sensor-based 3D surface scanning - Must measure standing volumetric foot dimensions under standard body weight - Required measurements: dual-foot length, width, arch height, heel width, ball girth, pressure distribution - Scan cycle must not exceed 20 seconds - Automated sizing algorithms must convert scan data to standard military combat boot sizes - Units must be ruggedized, self-contained, and have a touchscreen interface - Continuous software support and diagnostic calibration required - Distribution: 10 units across four battalions and Brigade/LTB headquarters (one as spare) - Annual technical service component included - No specific OEMs or vendors named; requirement is brand-agnostic for full and open competition - Notable requirements: high-volume recruit processing, ruggedization, rapid scan cycle, military boot sizing conversion
Description
amended to change PSC Code and NAICS Bottom Line Up Front (BLUF)The Brigade requires the procurement of ten (10) commercial-off-the-shelf (COTS), brand-agnostic Automated 3D Digital Footwear Fitting Systems and associated annual technical service. This acquisition modernizes the Initial Entry Training (IET) Clothing Initial Issue Point (CIIP) across the Reception Battalions. It directly addresses initial issue throughput constraints, eliminates manual sizing inaccuracies, and mitigates preventable lower-extremity musculoskeletal injuries (MSKIs) among incoming trainees.Operational JustificationReception Battalions process thousands of trainees per cycle under stringent processing timelines. Traditional manual measurement devices are prone to significant operator error, fail to capture volumetric dimensions and arch compression under load, and regularly lead to improperly fitted combat footwear. Ill-fitting boots remain a primary driver of preventable sick call visits, cellulitis, severe blister friction, and training pipeline attrition during Basic Combat Training (BCT) and One Station Unit Training (OSUT). Implementing an automated digital system allows duty personnel to capture comprehensive foot dimensions in under 20 seconds per soldier, ensuring objective, repeatable fit accuracy that protects force health and training timelines.Salient CharacteristicsTo maintain full and open competition, the solicited systems must operate using non-invasive optical or sensor-based 3D surface scanning that measures standing volumetric foot dimensions under standard body weight. The units must capture dual-foot length, width, arch height, heel width, ball girth, and pressure distribution within a single scan cycle not exceeding 20 seconds. Systems must incorporate automated sizing algorithms that directly convert millimeter scan data into standard military combat boot sizing across all standard lengths and widths (Narrow, Regular, Wide, and Extra Wide). Additionally, each unit must feature a self-contained, ruggedized platform built for high-tempo daily recruit volume, an intuitive touchscreen interface for operators, and continuous software support and diagnostic calibration capability.Unit Distribution and Operational ContinuityThe ten requested systems will be allocated based on trainee reception volume and mission continuity requirements. The 120th Adjutant General (AG) Battalion will receive four (4) systems to support its high-volume throughput requirements. The 30th, 43rd, and 95th AG Battalions will each receive two (2) systems to outfit their primary CIIP processing stations. The final system will be assigned to the Brigade/LTB headquarters as an operational reserve float. This designated spare ensures that any unexpected hardware malfunction, maintenance cycle, or recalibration event at a subordinate reception battalion can be addressed immediately without disrupting intake schedules.