Opportunity
SAM #FA521526Q0045
Potable Water Pumping System Replacement at Kokee Air Force Station, Hawaii
Buyer
FAC
Posted
September 16, 2026
Respond By
September 17, 2026
Identifier
FA521526Q0045
NAICS
237110
This opportunity involves the replacement of the potable water pumping system at Kokee Air Force Station, Hawaii, managed by the U.S. Air Force and the 611th Civil Engineer Squadron. - Government Buyer: - U.S. Air Force, Pacific Air Forces, Kokee Air Force Station - 611th Civil Engineer Squadron, Elmendorf AFB, Alaska - Products/Services Requested: - Removal and replacement of potable water pumping system in Building 3 (Pump House) - Installation of two new potable water pumps (configured for alternating cycles to ensure redundancy) - Replacement of all pump room piping, valves, and fittings (including corrosion-resistant materials) - Associated travel for installation team - Project management, coordination, safety, quality control, environmental compliance, and submission of installation reports, warranty, and as-built drawings - Quantities and Part Numbers: - Two new potable water pumps (no specific part numbers provided) - One double-pump replacement job/lot - Replacement of all piping, valves, and fittings (quantities not specified) - Unique/Notable Requirements: - System must deliver water to the highest site elevation, including the dome facility - Pumps must be configured for alternating cycles to balance wear and provide redundancy - All materials must be corrosion-resistant for harsh environmental conditions - Contractor must coordinate outages to minimize mission impact - Delivery of documentation including installation reports, warranty, and as-built drawings - Inspection and acceptance at Elmendorf AFB, Alaska - No specific OEMs or vendors are named in the solicitation or attachments.
Description
The requirement for the removal and replacement of the potable water pumping system located in Building 3 (Pump House) at Koke’e Air Force Station (AFS), Hawaii. The existing primary pump is severely degraded, leaking due to a failed seal, and exhibiting mechanical noise indicative of internal wear. The Contractor shall furnish all labor, management, supervision, engineering, tools, materials, equipment, transportation, and incidentals necessary to replace the pumping system, associated piping, and valves, and restore full operational capability to the site’s potable water distribution system.
See Attachements for more information.