Opportunity
North Carolina eVP #699-SRP-SW-ARP-0025-03
Cub Creek Phase 3 Stream Restoration and Greenway Trail Construction Opportunity
Posted
September 14, 2026
Respond By
October 19, 2026
Identifier
699-SRP-SW-ARP-0025-03
NAICS
237990
This opportunity involves the restoration of Cub Creek (Phase 3) in Wilkesboro, North Carolina, funded by the American Rescue Plan Act (ARPA). - Government Buyer: - Town of Wilkesboro, North Carolina - Administered by NC Department of Environmental Quality (NC DEQ) Division of Water Infrastructure - Project Scope: - Restoration of approximately 3,840 linear feet of Cub Creek to its confluence with the Yadkin River - Includes clearing, grading, stream excavation, in-stream structures, erosion control, and riparian planting - Products and Materials Requested: - Construction survey and as-built survey - Mobilization and stabilized construction entrance - Clearing/grubbing and grading (548,785 sq ft) - Stream excavation (3,842 linear feet) - Stone materials: Class 1 (2,500 tons), ABC Stone (22,975 tons), Rock Dust (18,400 tons), Boulder J-Hook Structure (24 units) - Geotextile fabric (8oz non-woven, 4,575 sq yd) - Erosion control: Coir matting (78,000 sq ft), temporary silt fence and rock silt screen (8,015 linear feet), silt fence rock outlet (61 units), temporary seeding (133,675 sq ft) - Riparian planting: livestakes (364), plugs (3,000), potted plants (975), bareroots (2,683) - In-stream structures: Offset Rock Cross Vane (24), Channel Block (2), Step Pool (1), Riffle Grade Control (1), Stone Toe Stabilization (637 linear feet), Ditch Plug (1), Special Stilling Basin with Rock Pad (1) - Unique Requirements: - Compliance with ARPA, SLFRF, and U.S. Department of the Treasury regulations (2 C.F.R. Part 200) - Liquidated damages of $1,000 per day for delays - No electronic bids permitted; strict reporting and retention requirements - No specific OEMs or branded vendors are mentioned; materials are generic construction and environmental restoration supplies. - Period of Performance: - 180 calendar days for project completion - Eligible costs incurred from March 3, 2021, to December 31, 2024 - Federal funding period extends through June 30, 2027
Description
The Town of Wilkesboro is soliciting sealed bids from qualified contractors for the restoration of approximately 3,840 linear feet (0.73 miles) of Cub Creek, completing the northeast reach to its confluence with the Yadkin River. The project site is located 5-6 miles downstream and northeast of the W. Kerr Scott Dam and Reservoir, an area prone to recurrent flooding affecting the Town's Cub Creek Wastewater Treatment Plant and adjacent lands. The project is federally funded through the American Rescue Plan Act (ARPA) and administered by the NC DEQ Division of Water Infrastructure. All required submittals, reports, and payments must be completed by May 21, 2026. Electronic bids are not permitted; submissions must follow instructions in the attachments.