Opportunity
Georgetown Ionwave #202669
Traffic Signal Installation at SH 195 and BCH Way – City of Georgetown Bid Opportunity
Posted
September 13, 2026
Respond By
October 08, 2026
Identifier
202669
NAICS
237310, 237990
The City of Georgetown, Texas is soliciting bids for a comprehensive traffic signal installation project at the intersection of SH 195 and BCH Way. - Government Buyer: - City of Georgetown, Texas - Procurement and Contract Services Office - Senior Buyer, Municipal Complex - Project Scope: - Complete installation of a permanent traffic signal system - Includes controller and cabinet assemblies, signal poles, pedestal poles, ground boxes, electrical service, conduit, wiring, signal heads, pedestrian signal units, and related infrastructure - Removal and installation of concrete, curbs, ramps, signs, street name sign supports, and pavement markings - Installation of LED vehicle and pedestrian signal sections, internally lighted street name signs, and video imaging vehicle detection systems (VIVDS) - Provision of battery back-up system, ground boxes, and force account work - Products & Quantities: - Over 60 distinct line items including: - 1 traffic signal system installation - 8 drill shafts for roadway illumination poles - 13 and 44 drill shafts for traffic signal poles (36 in and 48 in) - 3 portable changeable message signs - 107 concrete curb & gutter (Type II) - 6 LED vehicle signal sections (green), 5 (green arrow), 6 (yellow), 5 (yellow arrow), 8 (red), 3 (red arrow) - 2 pedestrian signal sections (LED countdown) - 3 VIVDS processor systems, 1 VIVDS camera assembly, 4 VIVDS control software - 3 internally lighted street name sign supports (Type 10BWG(1)SA(P)), 5 (Type 10BWG(1)SA(T)) - 3 ground boxes (Type D) with apron - 1 battery back-up system - 3 pedestrian detect push buttons - 1 pedestrian detector controller unit - 3 ILSN (8 section) - 3004 ft traffic signal cable (Type A), 305 ft (Type C) - 1 force account ($30,000 sum) - Unique/Notable Requirements: - Compliance with Texas prevailing wage laws and TxDOT standards - Substantial completion required within 90 days, final completion within 120 days after Notice to Proceed - One-year warranty period after completion - Bid bond (5% of bid), performance and payment bonds required - Statement of Bidders Experience must be submitted - Liquidated damages for delays - OEMs & Vendors: - No specific OEMs named for traffic signal equipment; Lee Engineering, LLC is the project engineer and document provider - Technical specifications and bidding documents available for purchase from Lee Engineering, LLC - All bids must be submitted electronically via the City E-bid system
Description
The City of Georgetown is soliciting sealed bids for a construction project involving the furnishing, installation, and provision of all labor and materials required for the installation of a traffic signal at the intersection of SH 195 at BCH Way. The project also includes miscellaneous items as detailed in the project drawings and specifications. Bidding documents are available for purchase at Lee Engineering in Dallas, Texas. Bids must be submitted electronically via the City E-bid system by October 8, 2026, and will be publicly opened immediately after the deadline.