Opportunity

Boone County School District Opengov #BCFY27-04

Boone County seeks bids for concrete curb, sidewalk, and ADA ramp replacement in Hebron, KY

Posted

September 14, 2026

Respond By

September 29, 2026

Identifier

BCFY27-04

NAICS

237310, 238110

  • Boone County Fiscal Court Public Works Department is seeking bids for the Northern Boone County Concrete Replacement project in Hebron, KY.
  • Scope includes:
    • Removal and replacement of 7,500 linear feet of 30-inch concrete curb and gutter (KYTC Class A concrete, minimum 4,000 PSI)
    • Replacement of 450 square yards of sidewalk (4-inch or 6-inch thickness as required)
    • Installation of 450 square yards of ADA-compliant pedestrian ramps with detectable warning surfaces
  • All work must comply with:
    • Kentucky Transportation Cabinet (KYTC) specifications
    • ADA Standards for Accessible Design
    • Public Rights-of-Way Accessibility Guidelines (PROWAG)
    • Boone County Subdivision Regulations
    • MUTCD traffic control standards
  • Contractors must provide all labor, equipment, materials, traffic control, restoration, and incidentals
  • No specific OEMs or vendors are named; the opportunity is open to all qualified concrete and construction contractors
  • Insurance and bonding requirements apply, including a 5% bid bond for bids over $100,000
  • All work must be completed by the specified deadline; contract duration is approximately 8.5 months from bid deadline

Description

Boone County Fiscal Court is soliciting bids from qualified contractors to provide labor, equipment, materials, traffic control, restoration, and incidentals necessary for the removal and replacement of damaged concrete curb, sidewalk, and ADA-compliant pedestrian ramps at various streets in Hebron, KY. The project includes saw cutting, removal, excavation, concrete placement, installation, backfilling, jointing, finishing, and curing of 30-inch concrete curb and gutter, sidewalk replacement with ADA compliance, and ADA ramp installation. All work must comply with KYTC specifications, ADA standards, PROWAG requirements, and Boone County regulations. The project must be completed by June 1, 2027.