Opportunity

Saskatchewan Tenders #HWY-B26044

Bridge Construction and Related Services for Highway 3 over Sturgeon River, Saskatchewan

Posted

September 11, 2026

Respond By

September 29, 2026

Identifier

HWY-B26044

NAICS

237310, 237990

This opportunity involves the construction of a short span bridge on Highway 3 over the Sturgeon River, managed by the Saskatchewan Ministry of Highways and Infrastructure. - Government Buyer: - Saskatchewan Ministry of Highways and Infrastructure - Scope of Work: - Design, construction, maintenance, and removal of a temporary detour - Erection of precast prestressed concrete stringers - Dismantling of existing bridges - Site restoration including topsoil and seeding - Supply and installation of miscellaneous steel, galvanized steel pier diaphragms, precast concrete abutment caps, pier caps, and wall panels - Bird management and environmental compliance - Foundation excavation, granular base course, asphalt concrete, riprap, guardrails, and railings - Concrete Type P1, piling (324 mm and 406 mm), granular backfill, filter blanket - Traffic accommodation and mobilization for pile driving - Products/Services Requested: - Multiple construction materials and services with specified part numbers and quantities (see line items below) - Unique/Notable Requirements: - Environmental and safety compliance, including bird management and erosion control - Warranty period of 12 months for ride quality and backfilling/surfacing defects - Liquidated damages for delays - 5% bid deposit required - Electronic submission of bids - No specific OEMs or brands are referenced; bidders must comply with detailed technical specifications for materials and approved products. - All quantities and specifications are detailed in the bid form and attachments.

Description

This solicitation is for the construction of a short span bridge on Highway No. 3 over the Sturgeon River, approximately 9.04 km west of Prince Albert, Saskatchewan. The work includes design, construction, maintenance, and removal of a temporary detour, as well as various bridge construction activities such as precast prestressed concrete stringer erection, dismantling of existing bridges, site restoration, and installation of miscellaneous steel and concrete components. Bidders must submit inquiries at least 3 business days prior to bid closing and provide a 5% bid deposit. The project completion date is October 30, 2027, and bids must be submitted electronically by September 29, 2026, 2:00 PM CST.

View original listing