Opportunity

Watauga Ionwave #26-004 Addendum 1

City of Watauga Solicits Construction Proposals for Capp Smith Park Food Truck Improvements

Posted

August 21, 2026

Respond By

September 18, 2026

Identifier

26-004 Addendum 1

NAICS

236220, 237310, 541380

The City of Watauga is seeking proposals for the construction of food truck park improvements at Capp Smith Park in Watauga, Texas. - Government Buyer: - City of Watauga, Finance Department - Project managed at City Hall Council Chambers - OEMs and Vendors: - Certerra South, LLC (geotechnical engineering) - Products and Construction Elements Requested: - Performance pavilion structure and architectural components - Restroom and concessions building (structure, HVAC, electrical, plumbing) - Artificial turf system installation - Low seat walls (stone veneer) - Site electrical components (service, distribution, lighting, fixtures, panels, equipment connections) - Sidewalks, accessible ramps, pedestrian walkways, detectable warning panels - Concrete mow strip, light poles, pavilion foundation - Services Requested: - Geotechnical engineering study and materials testing (Certerra South, LLC) - Site grading, earthwork, ground modification, excavation, moisture conditioning, recompaction, select fill - Traffic control plan for construction duration - Certified material testing for construction materials - Unique/Notable Requirements: - Compliance with Texas wage laws - 5% bid bond required - Strict allocation of bid items to prevent cost duplication - Adherence to geotechnical recommendations for subgrade preparation, foundation work, and post-tensioned slab foundations - Online proposal submission via IonWave and hard copy delivery - Project budget estimated at $2.2 million - Award to lowest responsive and responsible bidder, with qualifications reviewed

Description

This solicitation is a Request for Proposal issued by the City of Watauga for the construction of the City Project 26-004 Capp Smith Park Food Truck Improvements located in Watauga, Texas. The project includes construction of food truck park improvements along with necessary related work such as a performance pavilion, restroom and concessions building, accessible ramps, electrical work, and site grading. A non-mandatory pre-bid conference is scheduled, and proposals must be submitted online via IONWAVE with a required hard copy prior to the bid opening. The estimated project budget is $2.2 million with an anticipated construction duration of approximately 180 calendar days.

View original listing