Opportunity

Carrollton Ionwave #ENG2026-08 Addendum 2

City of Carrollton Trinity Mills LED Streetlight Project (Marsh Ln to Midway Rd)

Posted

August 27, 2026

Respond By

September 22, 2026

Identifier

ENG2026-08 Addendum 2

NAICS

238210, 237130

The City of Carrollton Engineering Department is seeking bids for the Trinity Mills LED Streetlight Project, covering Marsh Ln to Midway Rd. - Government Buyer: - City of Carrollton Engineering Department - OEMs and Vendors: - Oncor (OEM for wire, poles, light fixtures, and power connections) - Products and Services Requested: - Installation of 33 precast pole foundations (Oncor standard) - Installation of 1 secondary connection box (Oncor standard) - Installation of 3,925 linear feet of conduit (865 ft trenched PVC, 3,060 ft bored PVC, 40 ft rigid metal) - Installation of 15 pull boxes (originally listed, but replaced by secondary connection box in final scope) - Mobilization, traffic control, erosion control, tree trimming (8 trees), brick pavers (25 units), sod placement (256 units), irrigation adjustments - Videotaping project area - Unique or Notable Requirements: - All wire, poles, light fixtures, and power connections will be supplied and installed by Oncor - Contractor must furnish and install all other materials, provide labor and equipment for a complete and operational streetlight system - Engineering estimate for the project is $320,000 - Bid bond (5% of total bid) required - Contractor qualification documents and compliance with work hour and traffic control restrictions - Optional pre-bid meeting available - Detailed plans and specifications provided as attachments

Description

This solicitation is for the Trinity Mills LED Streetlight Project, which involves the installation of 33 pole foundations, 15 pull boxes (reduced to 1 secondary connection box), and 3,925 linear feet of conduit, along with other related items. All wire, poles, light fixtures, and power connections will be supplied and installed by Oncor. The contractor is responsible for furnishing and installing all materials and providing all necessary labor and equipment to complete the project, ready for use and operation by the City of Carrollton. The engineering estimate for the project is $320,000. An optional pre-bid meeting is scheduled at City Hall on September 10, 2026.

View original listing