Opportunity

San Clemente Planet bids #17355

OCTA Wall Repairs Over Pedestrian Underpass for City of San Clemente

Posted

September 10, 2026

Respond By

October 01, 2026

Identifier

17355

NAICS

238190, 237310, 237990

The City of San Clemente Public Works Department is seeking qualified contractors for the OCTA Wall Repairs Over Pedestrian Underpass project near the San Clemente Pier Train Station. - Government Buyer: - City of San Clemente Public Works Department - Scope of Work: - Demolition of two deteriorated 6-inch thick, 5-foot high, 9-foot long CMU (concrete masonry unit) walls - Construction of new 8-inch solid grouted CMU walls with stucco finish and tile caps to match existing structures - Mobilization, site controls (scaffolding, fencing, plywood floor protection), and site cleanup - Removal, storage, and reinstallation of existing art murals and railroad rock ballast - Rerouting of utilities to accommodate new wall installation - Installation of new rebar wall epoxy dowels and block/mortar placement with horizontal reinforcing - Placement of solid grout and installation of tile caps (City will provide tile pavers for 20 linear feet) - Application of stucco and paint finish, including expansion joints - Unique Requirements: - Coordination with two 48-hour railroad closure windows for critical work (grouting and stucco application) - Compliance with SCRRA railroad safety, flagging, and right-of-way access requirements (including mandatory safety training and flagging services) - Contractor must possess a valid California Class A or B license, be registered with the California Department of Industrial Relations, and have at least 5 years of experience in masonry, stucco, and concrete construction - Compliance with prevailing wage laws and provision of performance and payment bonds - No specific OEMs or branded products are mentioned; opportunity is open to qualified construction contractors - Estimated contract value is likely in the range of $100,000 to $250,000 based on scope and local construction costs

Description

The project involves demolishing two severely deteriorated 6-inch thick, 5-foot high, 9-foot long CMU walls adjacent to the San Clemente Pier Train Station and replacing them with new 8-inch solid grouted CMU walls finished with stucco and tile caps to match existing walls. The walls are doweled into the top slab of the existing concrete pedestrian tunnel and run parallel to the railroad tracks. The contractor must coordinate work with two 48-hour railroad closure windows in January 2027 and perform work mostly from scaffolding on the tunnel floor. The project includes removal and reinstallation of existing murals and rock ballast, utility rerouting, and cleanup. The work must be completed within 60 working days from the Notice to Proceed.

View original listing