Opportunity
SAM #CEHNC-031467-OT
USACE Huntsville Modular Power Generation & Distribution Solutions (OTA White Paper Request)
Buyer
USACE Engineering Support Center Huntsville
Posted
September 10, 2026
Respond By
September 25, 2026
Identifier
CEHNC-031467-OT
NAICS
335311, 237130, 221118, 221122
This opportunity from the U.S. Army Corps of Engineers, Huntsville Center, seeks innovative, turnkey modular power generation and distribution solutions for multiple sites across the U.S. - Project requires factory-integrated systems capable of supplying 18-22 MW peak loads at 10-12 locations - Diesel reciprocating internal combustion engine generators (Tier 2 certified, Tier 4 compliant) - N+1 redundancy (option for N+2), automated paralleling, black-start capability - Harmonic distortion limits, voltage stability, neutral grounding resistor - Compliance with Buy American Act is mandatory - Includes step-down transformers, switchgear, distribution systems, fuel and DEF storage/distribution - Optional fixed transportable load bank and Operation & Maintenance (O&M) support for up to 2 years - SCADA and utility monitoring systems required - Prototype solution must be delivered and operational by 28 February 2028 - Multiple awards anticipated, each ranging from $55M to $100M - White papers are requested under Other Transactional Authority (OTA); no specific OEMs or part numbers provided - Opportunity is open for industry to propose solutions meeting these requirements
Description
Other Transactional Authority Request for White PapersModular Power Generation and Distribution:
The Department of Defense has an urgent, unmet requirement for relocatable Modular Power Generation and Distribution solutions. These systems are unique that must be capable of supplying and stabilizing large transient loads that are typically problematic for traditional power generation solutions. A solution is required at various locations across the 50 United States. Current operational sites lack the foundational power generation and distribution architecture necessary to support modern, power-intensive mission equipment. There is a critical need for these solutions to be implemented no later than 28 February 2028 to meet additional mission objectives.
The U.S. Army Corps of Engineers, Huntsville Center (CEHNC) has an ongoing mission to support requirements across the Department of War (DoW). CEHNC has been tasked to provide all manufacturing, procurement, shipping, delivery, installation, and testing of Modular Power Generation and Distribution Solutions for 10-12 sites in the 50 United States. Additional Links:Department of Defense Procurement ToolboxPIEE Solicitation Module Link for CEHNC-031467-OTRegistration Instructions for the PIEE Solicitation ModuleWeb Based Training for the PIEE Solicitation Module