Opportunity

California eProcure #26-30612-000

Complete Replacement of West Perimeter Vehicle Bridge at Patton State Hospital

Posted

September 10, 2026

Respond By

October 20, 2026

Identifier

26-30612-000

NAICS

237310

This opportunity involves the full replacement of the West Perimeter Vehicle Bridge at Patton State Hospital, managed by the California Department of State Hospitals (DSH). - Government Buyer: - State of California, Department of State Hospitals (DSH) - Administrative Services Division, Facilities Planning, Construction, and Management - Contact: Ramon De Haro - Scope of Work: - Demolition and removal of the existing vehicle bridge and associated site elements - Construction of a new vehicle bridge, including ADA-compliant warning curbs - Earthwork, grading, concrete paving, and reconstruction of pavement and approach transitions - Removal, relocation, or protection of existing water lines; coordination of utility shutdowns (limited to four hours unless otherwise approved) - Erosion control, temporary traffic and access control, and site restoration - Requirements: - Contractor must hold a B-General Building Contractor license - 3% Disabled Veteran Business Enterprise (DVBE) participation required - All work must comply with approved drawings and specifications - Liquidated damages of $3,000 per day for delays - Design and Engineering: - Project design by J.C. Chang & Associates, Inc. - Engineering input from Buehler Engineering - OEMs and Vendors: - No specific OEMs for bridge components are named; focus is on construction services and materials per plans - Notable Requirements: - Strict coordination of utility shutdowns with facility operations - Adherence to ADA standards and all applicable codes - Project duration is 365 calendar days, executed in two phases

Description

This solicitation is for the replacement of the existing West Perimeter Vehicle Bridge at the Department of State Hospitals (DSH) Patton facility. The contractor is required to provide all necessary materials, supplies, tools, equipment, transportation, licenses, permits, prevailing wages, insurance, bonds, and labor to complete the project. The scope includes demolition and removal of the existing bridge and associated site elements, installation of a new vehicle bridge, construction of ADA-compliant warning curbs, removal and relocation/protection of existing water lines, and reconstruction of pavement and approach transitions on both sides of the bridge to achieve proposed grades. Additional work includes earthwork, grading, concrete paving, bridge span construction, utility coordination, erosion control, temporary traffic and access control, and site restoration.

View original listing