Opportunity

Cumberland County NC MUNIS #809

Sheriff Training Center Boiler and Pumps Replacement Solicitation

Posted

September 09, 2026

Respond By

September 16, 2026

Identifier

809

NAICS

238220, 238290

Cumberland County, North Carolina is seeking bids for the replacement of the boiler and pumps at the Sheriff's Training Center. - Government Buyer: - Cumberland County Sheriff's Training Center - OEMs and Vendors: - Lochinvar (CopperFin II natural gas boiler, model CHN1802-M9) - Bell & Gossett (e-Series base mounted pump, model e1510-1.25BC-145T-S) - Johnson Controls International PLC (HVAC system controls integration) - Products Requested: - Hot water boiler (preferred: Lochinvar CopperFin II, model CHN1802-M9) - 1,800,000 Btu/Hr input, 1,530,000 Btu/Hr output, ASME Copper Finned Heat Exchanger, 85% thermal efficiency - Quantity: 1 - Hydronic pumps (preferred: Bell & Gossett e-Series, model e1510-1.25BC-145T-S) - 2 HP, 1800 RPM, 145T Frame, 8" Impeller, Nema Premium Efficient Motor - Quantity: 2 - Services Requested: - Removal and disposal of existing boiler and pumps - Installation and commissioning of new boiler and pumps - Integration with Johnson Controls HVAC system - Site cleanup and debris removal - Unique/Notable Requirements: - Compliance with North Carolina contractor licensing (NC H-1 or H-2 License and/or NC General Contractor License) - Manufacturer-authorized technician required for startup and commissioning - Minimum one-year warranty on parts and labor - All work must be completed within sixty calendar days of commencement - Proper temperature regulation and minimal impact to daily operations during project

Description

This solicitation is for the replacement of the boiler and pumps at the Sheriff's Training Center. The work includes removal and disposal of existing equipment, installation of a new hot water boiler and two hydronic pumps, integration with existing electrical and piping systems, and all necessary permits and inspections. The contractor must ensure proper startup, testing, and commissioning of the new equipment, and provide a minimum one-year warranty on parts and labor. All work must be completed by appropriately licensed contractors and within 60 calendar days of the notice to proceed.

View original listing