Opportunity
CanadaBuys #PEIG-DTI-7247
Eliot River Road Bridge Replacement Solicitation in Prince Edward Island
Posted
September 09, 2026
Respond By
September 29, 2026
Identifier
PEIG-DTI-7247
NAICS
237310, 237990
This opportunity involves the complete replacement of the Eliot River Road bridge in Green Bay, Prince Edward Island, managed by the Department of Transportation and Infrastructure. - Government Buyer: - Province of Prince Edward Island, Department of Transportation and Infrastructure - Scope of Work: - Demolition and removal of the existing bridge structure - Excavation, slope protection, and environmental controls - Installation of steel piles (341.5 m supply, 230 m drive) and pipe piles (149.4 m supply, 110 m drive) - Concrete formwork, reinforcement (2,800 kg), cast-in-place concrete (28 m³), and concrete barriers (90 units) - Construction of a new timber bridge structure, including timber lagging (100 m²), stringers (643.5 m), and decking (237 m²) - Structural steel barriers, miscellaneous metals (10,200 kg), rip rap (825 tonnes), gabion baskets (30 m³), and roadwork with asphalt millings (250 tonnes) - Ancillary items: clearing, grubbing, fine grading, topsoil, hydroseeding, guardrail removal/erection, traffic control devices, bearing pads, project layout, mobilization/demobilization - Notable Requirements: - Compliance with provincial standard specifications and environmental protection plan - Environmental controls must be maintained until vegetation is established - Adherence to Canadian Free Trade Agreement (CFTA) - Safety and environmental compliance throughout construction - No specific OEMs or vendors are named; all materials and equipment must meet provincial standards. - Estimated contract duration is 70 working days, split between two phases, with a one-year warranty period after completion.
Description
This solicitation is for the complete replacement of the existing bridge structure on Eliot River Road, Route 249, in Green Bay, Prince Edward Island. The work includes excavation, slope protection, environmental controls, asphalt excavation, demolition and removal of the existing structure, installation of steel piles, concrete formwork and reinforcement, cast-in-place concrete, new timber structure, structural steel barrier, rip rap, gabion baskets, road work with asphalt millings, and all other necessary ancillaries. The project must be completed to the satisfaction of the Owner within an estimated contract duration of 3 months. The procurement method is competitive open bidding under the Canadian Free Trade Agreement (CFTA).