Opportunity
Lincoln Electric System Procureware #113-26
LES seeks construction and installation of two combustion turbine generator units and associated equipment at TBGS South Powerblock Expansion
Posted
September 08, 2026
Respond By
December 10, 2026
Identifier
113-26
NAICS
237130, 333611
Lincoln Electric System (LES), a municipal utility in Lincoln, Nebraska, is seeking bids for the construction and installation of two new simple cycle combustion turbine generator (CTG) units and associated Balance of Plant (BOP) equipment at the Terry Bundy Generating Station South Powerblock Expansion. - Government Buyer: - Lincoln Electric System (LES), City of Lincoln, Nebraska - Terry Bundy Generating Station - OEMs and Vendors: - General Electric (GE) is referenced as a preferred OEM for LM6000 or similar aero-derivative units - Other OEMs may include Siemens Energy, Mitsubishi Power, and Solar Turbines (based on industry standards for combustion turbines) - Products/Services Requested: - Two simple cycle combustion turbine generator packages (Units 5 and 6) - Part Number: C205 - Quantity: 2 - CTG Exhaust Packages - Part Number: C212 - Quantity: 2 - GSU Transformer Packages - Part Number: C203 - Quantity: 2 - Electrical Switchgear (115kV) - Part Number: C204 - Quantity: 1 - Pre-engineered metal building (PEMB Skid Building 3) - Part Number: C218 - Quantity: 1 - Distributed Control System (DCS) Equipment - Part Number: C211 - Quantity: 1 - Construction services for installation, startup, commissioning, and performance testing - Geotechnical engineering services for foundation and earthwork design - Optional services for onsite storage, rigging, transport, and temporary commissioning connections - Unique/Notable Requirements: - Prior experience with power generation or heavy-industrial facility installations of combustion turbine units above 10 MW - Preferred references for GE LM6000 or similar aero-derivative units - Compliance with Nebraska sales and use tax regulations - Mandatory options for onsite storage and temporary commissioning connections - Insurance and bonding requirements from Nebraska-licensed and A.M. Best B+ rated insurers - Equal Employment Opportunity Compliance Form submission - Detailed geotechnical engineering and foundation design support - All questions must be submitted via the LES bid portal
Description
This solicitation is for the construction of two combustion turbines and associated equipment at the Terry Bundy Generating Station (TBGS) South Powerblock Expansion Project. The work includes all labor, materials, and equipment necessary to complete the project as specified in the bid documents. A non-mandatory pre-bid meeting is scheduled for October 20, 2026, at 1:00 PM CST in Lincoln, NE. Bidders must submit their proposals by December 10, 2026, and comply with all contract requirements including performance bonds and adherence to applicable laws and regulations.