Opportunity
Los Angeles County Lacounty #RFB-IS-27200153
Demolition and Restoration of Swimming Pool Area at Los Angeles General Medical Center
Posted
September 08, 2026
Respond By
September 18, 2026
Identifier
RFB-IS-27200153
NAICS
238910, 238990, 238110
This opportunity involves demolition and restoration services for the swimming pool area at Los Angeles General Medical Center, managed by the County of Los Angeles Internal Services Department. - Government Buyer: - County of Los Angeles, Internal Services Department - Los Angeles General Medical Center - Scope of Work: - Demolition of existing concrete pool walls (approx. 540 SF / 20 CY) - Core drilling ten (10) 18"-diameter drainage holes through pool floor - Backfilling pool basin (approx. 1,800 SF / 420 CY) with engineered fill dirt or flowable fill (CLSM) - Removal of surrounding concrete pavement (approx. 9,760 SF / 185 CY) and ramp (approx. 1,390 SF / 27 CY) - Excavation for ramp subgrade (approx. 1,390 SF / 42 CY) and site grading (approx. 9,760 SF / 260 CY) - Asphalt surface restoration (6" thick patch over removed areas) - Debris haul-off to authorized dump facility and daily site housekeeping - Requirements: - Contractors must hold a valid and active California contractor license (C-8, C-12, C-21, or B) - Must be registered with California Department of Industrial Relations for prevailing wage work - Mandatory job walk attendance - Provide references for similar completed projects - Operators must be qualified and certified as required - No specific OEMs or vendors are named; opportunity is open to qualified construction contractors - Estimated demolition/removal quantity: approx. 12,950 SF / 245 CY (excluding pool infill) - Period of performance: 45 days from award, Monday–Friday, 7:00 a.m. to 4:00 p.m.
Description
This solicitation is for construction services related to the demolition and restoration of a swimming pool area at the Los Angeles General Medical Center. The scope includes removal of concrete pool walls, floor drainage core drilling, backfilling the pool basin, removal of concrete pavement and ramp, excavation for ramp subgrade and site grading, asphalt surface restoration, and debris haul-off. A mandatory job walk is scheduled, and bidders must hold appropriate California contractor licenses and comply with prevailing wage laws. The project must be completed within 45 days after award, with work conducted Monday through Friday from 7:00 a.m. to 4:00 p.m.