Opportunity
Missouri Springfield Civic Plus #013-2027IFB
Construction of Lost Hill Park Greenway Trail Bridge and Concrete Trail in Springfield, MO
Posted
September 08, 2026
Respond By
October 07, 2026
Identifier
013-2027IFB
NAICS
237310, 237990
This opportunity involves the construction of a new concrete bridge and trail at Lost Hill Park Greenway Trail in Springfield, Missouri. - Government Buyer: - City of Springfield, Division of Purchases (Buyer: Todd Cox) - Springfield-Greene County Park Board, with federal funding via FHWA and MoDOT - Project Scope: - Build a multi-cell reinforced concrete pedestrian and bicycle bridge (approx. 46.5 ft wide x 18.5 ft long) - Replace an existing low-water crossing that is frequently underwater - Construct a 10-14 ft wide bridge and a 10 ft wide connecting concrete trail (approx. 433 ft sidewalk) - Include riprap bank stabilization, signage, seeding, erosion control, and ADA accessibility - Products/Services Requested: - Mobilization, cleaning, grubbing, surveying, removal of improvements - Linear grading, aggregate base, subgrade compaction, concrete sidewalk, construction signs, barricades - Full depth pavement repair, seeding, silt fence, rock ditch liner, reinforcing steel, Class B-1 concrete - Unique Requirements: - Compliance with Missouri prevailing wage laws and federal Davis-Bacon Act - Adherence to ADA accessibility standards - Environmental and cultural permits (Section 401 Water Quality Certification, US Army Corps of Engineers Nationwide Permit 23) - Bidders must be prequalified with MoDOT as prime contractors - Project funded in part by federal aid (Transportation Alternatives Program) - No specific OEMs or named vendors; construction materials and services only - Period of Performance: - Substantial completion within 180 days from Notice to Proceed; final completion within 30 days thereafter - Environmental permits valid through 2031; construction planned for 2025 - All bidding documents, plans, and special provisions are available online; pre-bid meeting scheduled
Description
The City of Springfield is soliciting bids for the construction of a new bridge at Lost Hill Park Greenway Trail to replace a low-water crossing that is frequently underwater. The project includes building a concrete bridge 10-14 feet wide and a connecting 10-foot wide concrete trail. Bids must be submitted electronically by October 7, 2026, with a pre-bid meeting scheduled for September 17, 2026. The project requires compliance with Missouri prevailing wage laws and federal employment regulations.