Opportunity

CanadaBuys #AB-2026-06192

Modular Construction of 20-Person Sleeper at Loon River Fire Base

Posted

September 08, 2026

Respond By

September 28, 2026

Identifier

AB-2026-06192

NAICS

236220, 321992

The Province of Alberta's Forestry and Parks agency is soliciting proposals for the modular construction of a 20-person sleeper building at the Loon River Fire Base. - Government Buyer: - Province of Alberta, Forestry and Parks agency - Project Scope: - Modular construction of a 30-foot wide by 88-foot long sleeper building - Building consists of two 15-foot by 88-foot modules joined with a gable roof - Includes two 6-foot by 6-foot decks with stairs at each end - Delivery, setup, and commissioning of the completed structure at the fire base - Requirements: - Submission of specifications, materials used, floor plan, plumbing, electrical, construction and elevation drawings, and pile layout - Modular construction and detailed design documentation - Facility must be fully operational upon completion - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Products/Services Requested: - Modular sleeper building (no part numbers or brands specified) - Design, build, deliver, setup, and commission services - Unique/Notable Requirements: - Modular construction approach - Comprehensive design and documentation submission - Commissioning of the facility at the specified location

Description

The Province invites formal written proposals for the modular construction of a 30’ wide x 88’ long twenty (20) person wet sleeper comprised of two (2) 15’ x 88’ modules, complexed together with a gable roof over the entire structure to be located at the Loon River Fire Base. The sleeper will have two (2) 6’ wide x 6’ deep decks attached with one (1) set of stairs on each, one at each end of the building. Proposals should include specifications, materials used, floor plan, plumbing, electrical, construction and elevation drawings, as well as pile layout requirements. The sleeper must be completed, delivered, setup, and commissioned by March 19, 2027.

View original listing