Opportunity
Interior Health Bids and Tenders #6322003
Mechanical contractor services for humidification system upgrade at KLH operating rooms
Posted
September 02, 2026
Respond By
September 29, 2026
Identifier
6322003
NAICS
238220, 238290
Interior Health is seeking mechanical contractor services for upgrading the humidification system in the Make-Up Air Unit-1 serving KLH operating rooms. - Government Buyer: - Interior Health (Canadian healthcare agency) - Scope of Work: - Supply and installation of a mechanical humidification system - Installation of a packaged humidifier unit - Modifications to ductwork, domestic cold water and condensate piping - Heat tracing and insulation - Structural roof supports and roofing reinstatement - Electrical power and distribution - Integration with existing Delta DDC controls system - Removal of redundant equipment - Testing, balancing, startup, commissioning, and documentation - Maintain operation of existing HVAC systems except for planned shutdowns - Estimated Construction Budget: - $200,000 - Unique Requirements: - Contractor must state Ready-for-Takeover date - All work must be coordinated to minimize disruption to operating rooms - No specific OEMs, brands, or part numbers are mentioned in the solicitation.
Description
The project involves upgrading the existing Make-Up Air Unit-1 Air handling unit serving the operating rooms by supplying and installing a mechanical humidification system to meet CSA Z317.2 and applicable codes and standards. Work includes installing a packaged humidifier unit, modifying existing ductwork, domestic cold water and condensate piping, heat tracing and insulation, structural roof supports and roofing reinstatement, electrical power and distribution, integration with the existing Delta DDC controls system, removal of redundant equipment, and all associated tie-ins. The contractor shall provide testing, balancing, startup, commissioning, and documentation while maintaining operation of existing HVAC systems except for planned shutdowns required for installation and commissioning. The estimated construction budget is $200,000.00. Contractors are required to state the Ready-for-Takeover date.