Opportunity
Owasso Civicplus #Nottingham Drainage Improvements
Owasso Nottingham Drainage Improvements: Storm Sewer, Roadway, and Waterline Construction
Posted
September 04, 2026
Respond By
October 06, 2026
Identifier
Nottingham Drainage Improvements
NAICS
237110, 237990
The City of Owasso Public Works Department is seeking bids for the Nottingham Drainage Improvements project in Nottingham Estates Phase IV, Owasso, Oklahoma. - Government Buyer: - City of Owasso, Public Works Department - Project Scope: - Installation of 48-inch corrugated polypropylene (HDPE-type) storm sewer pipe (862 LF) - Additional pipe installations: 30", 36", 42" reinforced concrete pipes (RCP), 24" and 42" corrugated polypropylene pipes - Construction of manholes (3 units, 6' diameter with grated lids), inlets (standard and SMD-Type 1), and junction boxes - Channel modifications, clearing, grubbing, excavation, and urban right-of-way restoration - Roadway improvements: aggregate base, subgrade, separator fabric, tack coat, superpave asphalt, curb and gutter, sidewalks, driveways, and paving replacement - Waterline installation: 8" PVC water pipe (94 LF), gate valves, solid sleeves, ductile iron bends, and water service reconnections - Erosion control: Stormwater Pollution Prevention Plan (SWPPP), sodding, flowable fill - Removal and resetting of existing signs, construction traffic control, and fence installations (wood privacy and chain link style) - OEMs and Vendors: - No specific OEMs named; key materials include corrugated polypropylene pipe (likely manufacturers: Advanced Drainage Systems, JM Eagle, or similar) - Unique/Notable Requirements: - Compliance with 2019 Oklahoma Standard Specifications for Highway Construction and City of Owasso standards - Mandatory pre-bid meeting, proposal guaranty (5% of bid), and provision of performance, maintenance, and statutory payment bonds - Environmental and safety requirements: erosion controls, construction safety plan, and permits - Detailed construction phases and site restoration - Quantities and Part Numbers: - 862 LF of 48" corrugated polypropylene pipe (SP), 127 LF of 42" RCP, 113 LF of 36" RCP, 40 LF of 30" RCP, 4253 SF of sodding, 726 tons of aggregate base, 644 tons each of superpave asphalt types S3 and S4, 161 LF of curb and gutter, 94 LF of 8" PVC water pipe, and more - All construction must adhere to Oklahoma Department of Transportation standards and environmental regulations.
Description
This project involves the installation of a 48-inch HDPE storm sewer pipe in the rear yards of Nottingham Estates Phase IV to improve drainage in the subdivision. The scope includes removing fences and pavement, channel modifications, and installing the drainage pipe. Additionally, improvements to the cul-de-sac at the low end of Nottingham IV will be made, including the addition of curb inlets, full width grated inlets, pipe, and paving replacement. A mandatory pre-bid meeting is scheduled, and bidding will comply with the Oklahoma Public Competitive Bidding Act.