Opportunity
SAM #1240BD26Q0088
USFS Slide-in Water Tank System for Dump Truck
Buyer
USFS CSA Northwest 2
Posted
September 04, 2026
Respond By
September 16, 2026
Identifier
1240BD26Q0088
NAICS
332420
This opportunity from the U.S. Forest Service (Gifford Pinchot National Forest, Wind River Ranger District) seeks a commercial-grade slide-in water tank system for installation in a government-owned 2013 Freightliner M2 dump truck. - Government Buyer: - USDA Forest Service, Gifford Pinchot National Forest, Wind River Ranger District (CSA Northwest 2, Portland, OR) - OEMs & Vendors: - No specific OEMs or vendors are named; open to commercial manufacturers of water tank systems and related equipment - Products/Services Requested: - Slide-in water tank unit (2,600–3,000 gallon capacity) - Minimum 3/16-inch mild or stainless steel construction - Internal baffles for surge control - Structural anchoring system with tie-down loops - Securement hardware kit - Integrated self-contained loading/unloading support stand - Auxiliary engine (minimum 23 HP, V-Twin gasoline or equivalent diesel, electric key start, independent fuel source) - High-performance centrifugal pump (minimum 110 GPM @ 100 PSI, 430 GPM @ 25 PSI) - Integrated priming system (exhaust vector, hand primer, or 12V electric priming pump) - Hydrant fill point (minimum 2.5-inch diameter, anti-backflow) - Protective brush guard (heavy-duty steel tubular cage) - Rear spray system (multi-nozzle, pneumatically controlled) - Primary and auxiliary discharge valves (2.5-inch and 1.5-inch, manual ball valves) - Rapid evacuation valve (4-inch butterfly dump valve) - Hose reel & line (1.5-inch x 50-foot heavy-duty utility hose) - Shipping and handling (only if contractor facility is outside 100-mile radius of Carson, WA) - Unique/Notable Requirements: - Strict adherence to host vehicle's mechanical and physical boundaries - Self-contained loading/unloading capability for the tank unit - Mandatory brush guard protection for auxiliary equipment - Delivery required within 60 calendar days of award - All components must be engineered for rugged, off-road use - Evaluation based on technical acceptability, delivery timeline, and price - No specific part numbers or brands are referenced; the solicitation is open to commercial solutions meeting the technical specifications.
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. Quotations are being requested.
The U.S. Forest Service (Gifford Pinchot National Forest, Wind River Ranger District) requires the acquisition of a brand-new, commercial-grade, slide-in water tank unit. This system will be deployed in an existing government-owned dump truck host vehicle and operated primarily on rough, unpaved, and mountainous U.S. Forest Service access roads.<!--TgQPHd|||[]-->
EXCLUSIONS:<!--TgQPHd|||[]--> This acquisition explicitly DOES NOT<!--TgQPHd|||[]--> include the purchase or provision of a new dump truck vehicle body.<!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--> INCLUSIONS:<!--TgQPHd|||[]--> This requirement is strictly for the fabrication, testing, and turn-key delivery of the complete slide-in water tank unit and matching securement hardware kit as detailed below
2. Schedule of Items (CLIN Structure)<!--TgQPHd|||[]-->
This procurement is conducted under FAR Part 12 Simplified Acquisition Procedures<!--TgQPHd|||[]--> [12.203]. Bidders must submit a Firm-Fixed-Price (FFP) quote covering all items to be considered responsive:<!--TgQPHd|||[]-->
CLIN 0001:<!--TgQPHd|||[]--> Slide-in Water Tank Unit (2,600 - 3,000 Gallon Capacity, as specified) | Qty: 1 | Unit: EA<!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--> CLIN 0002:<!--TgQPHd|||[]--> Shipping and Handling: FOB Destination to Carson, WA 98610. (Note: Shipping costs will be evaluated but only executed if the successful contractor's facility is located outside the 100-mile local government pickup radius).
3. Core Technical Salient Characteristics Summary<!--TgQPHd|||[]-->
The manufactured water tank system must conform strictly to the mechanical and physical boundaries of the government's host vehicle (2013 Freightliner M2, 4-Axle Dump Truck<!--TgQPHd|||[]--> equipped with a drop axle).<!--TgQPHd|||[]-->
Physical Footprint Box Constraints:<!--TgQPHd|||[]--><!--TgQPHd|||[]-->
<ul>
<li><strong>Main Tank Truck Box Clearance:<!--TgQPHd|||[]--></strong> Main tank structure must drop cleanly into the truck bed box dimensions (<strong>180”L × 72”W × 54”H<!--TgQPHd|||[]--></strong>).<!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Ultimate System Maximum Footprint:<!--TgQPHd|||[]--></strong> Total overall footprint of the completed assembly—inclusive of the tank box shell, rear plumbing manifolds, auxiliary pumps, engines, utility reels, and guards—must not exceed <strong>216” Long × 72” Wide × 66” High<!--TgQPHd|||[]--></strong>.<!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Rear Overhang Allowance:<!--TgQPHd|||[]--></strong> Bidders are permitted to utilize up to a 216-inch overall footprint length, allowing the rear subframe, auxiliary pump assembly, plumbing manifold, and brush guard to overhang past the 180-inch rear edge of the dump bed floor.<!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<!--TgQPHd|||[]-->
</ul>
<!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Capacity & Fluid Control:<!--TgQPHd|||[]--></strong> Minimum <strong>2,600-gallon<!--TgQPHd|||[]--></strong> operational fluid capacity required, with a target performance goal of <strong>3,000 gallons<!--TgQPHd|||[]--></strong>. Built with engineered internal lateral and longitudinal baffles to control intense liquid surge on off-road terrain.<!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Structural Integration & Support Legs:<!--TgQPHd|||[]--></strong> Heavy-duty tie-down loops or D-rings welded onto the front and rear faces of a 5-inch steel tube perimeter subframe. Must feature an integrated, self-contained structural storage stand or folding drop-leg support jacks capable of supporting the fully evacuated weight of the unit to allow for independent loading and unloading <strong>without requiring external heavy machinery<!--TgQPHd|||[]--></strong> (cranes or forklifts).<!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Standalone Pump & Engine Setup:<!--TgQPHd|||[]--></strong> High-performance, single-stage centrifugal transfer/fire pump matching or exceeding <strong>110 GPM at 100 PSI<!--TgQPHd|||[]--></strong> (High-Pressure) and <strong>430 GPM at 25 PSI<!--TgQPHd|||[]--></strong> (High-Volume). Equipped with an integrated priming system capable of self-loading/draft from a static environmental water source. Completely self-powered via a dedicated auxiliary engine (minimum 23 HP, V-Twin gas or diesel equivalent) with an independent 5-gallon fuel tank. <strong>Vehicle PTO, hydrostatic, or hydraulic-driven pump systems are strictly prohibited.<!--TgQPHd|||[]--></strong><!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Auxiliary Equipment Protection:<!--TgQPHd|||[]--></strong> If any part of the motor, pump assembly, or hose reel hangs past the truck bed floor, an integrated steel tubular wrap-around brush guard/cage is <strong>mandatory<!--TgQPHd|||[]--></strong> to shield mechanical parts from backing impacts and flying debris.<!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<li><strong>Plumbing System:<!--TgQPHd|||[]--></strong> Minimum 2.5-inch hydrant fill pipeline with female NST swivel connector and anti-backflow mechanism; pneumatic multi-nozzle rear spray system linked directly to the truck's service/brake air supply lines; dedicated 2.5-inch and 1.5-inch discharge systems with quarter-turn manual ball valves; a 4-inch rapid gravity evacuation butterfly dump valve; and an integrated 1.5-inch × 50-foot heavy-duty pre-plumbed utility hose reel.<!--TgQPHd|||[]--><!--TgQPHd|||[]--><!--TgQPHd|||[]--></li>
<!--TgQPHd|||[]-->
<!--TgQPHd|||[]-->
<!--TgQPHd|||[]-->
4. Evaluation Criteria & Basis for Award<!--TgQPHd|||[]-->
Quotes will be evaluated under FAR 12.203. Award will be made to the responsible offeror whose quotation represents the most advantageous solution<!--TgQPHd|||[]--> to the Government, considering the following three evaluation factors:<!--TgQPHd|||[]-->
Technical Acceptability:<!--TgQPHd|||[]--> The degree to which the offered tank assembly meets or exceeds the mandatory technical salient characteristics.<!--TgQPHd|||[]--><!--TgQPHd|||[]--> Delivery Timeline:<!--TgQPHd|||[]--> The contractor’s verified capability to manufacture, test, and deliver the completed unit within the mandatory 60-calendar-day performance period<!--TgQPHd|||[]-->.<!--TgQPHd|||[]--><!--TgQPHd|||[]--> Price:<!--TgQPHd|||[]--> Evaluated to ensure the final proposed price is fair and reasonable.
5. Submission Instructions for Offerors
Quotation Package Structure:<!--TgQPHd|||[]--> To be considered responsive, packages must be organized in the following order:<!--TgQPHd|||[]-->
SF-1449 Form:<!--TgQPHd|||[]--> Completed and signed in Blocks 17a, 30a, 30b, and 30c (Legibly list Company Name, Telephone, Email, and SAM Unique Entity ID (UEI) in Block 17a).<!--TgQPHd|||[]--><!--TgQPHd|||[]--> SF-30 Amendments:<!--TgQPHd|||[]--> Signed copies acknowledging all formal amendments issued (if applicable).<!--TgQPHd|||[]--><!--TgQPHd|||[]--> Schedule of Items Pricing:<!--TgQPHd|||[]--> Complete the firm-fixed pricing grid for CLIN 0001 and CLIN 0002.<!--TgQPHd|||[]--><!--TgQPHd|||[]--> Technical Evaluation & Delivery Documents:<!--TgQPHd|||[]--> Submit a fully filled out and signed copy of Attachment 1 (Requirements Compliance Checklist)<!--TgQPHd|||[]--> detailing any equivalents A basic Product Layout Sketch or Drawing<!--TgQPHd|||[]--> proving the completed assembly satisfies the 216”L × 72”W × 66”H boundary envelopment parameters A brief Delivery Milestone Schedule<!--TgQPHd|||[]--> confirming production capacity to hit the 60-day deadline.
See attached Solicitation and Requirements Checklist.