Opportunity
Worcester Worcester #8809-W7
Worcester Complete Street Improvements – Multi-Site Construction and Infrastructure Upgrades
Posted
October 04, 2023
Respond By
September 30, 2026
Identifier
8809-W7
NAICS
237310, 237110, 237990
The City of Worcester Department of Transportation & Mobility is seeking bids for a large-scale Complete Street Improvements project at multiple locations across Worcester. - Government Buyer: - City of Worcester, Department of Transportation & Mobility - Scope of Work: - Construction improvements at intersections and streets including Franklin Street/Norfolk Street/Suffolk Street, Pleasant Street/Tiverton Parkway/Mill Street, Pleasant Street/Fruit Street/Newbury Street, 200 Mill Street, Shrewsbury Street/Mount Carmel Way, 539 Southbridge Street, 90 Camelot Drive, and 22 Mann Street - Horizontal construction services such as: - Excavation, trenching, and rock disposal - Installation of catch basins, manholes, and stormwater infrastructure - Curb and sidewalk construction (concrete and bituminous) - Pavement milling, resurfacing, and new pavement markings (thermoplastic and preformed) - Installation and adjustment of traffic signs, guardrails, bollards, gates, and delineator posts - Environmental protection measures (e.g., silt sacks, seeding, mulch) - Accessibility improvements (wheelchair ramps with detectable warning panels) - Safety and traffic management requirements - Products/Materials Requested (examples): - Concrete and bituminous sidewalks and driveways - Superpave asphalt mixes (9.5MM, 12.5MM, 19MM) - Thermoplastic pavement markings (4", 6", 12" lines, arrows, symbols, bike lane markings) - Precast cement concrete RRFB foundations - Catch basin frames, grates, manhole covers, granite inlet stones - Guardrails (wooden and metal), bollards, gates - Various pipes, valves, and hydrant adjustments - Quantities: - Hundreds to thousands of units for many line items (e.g., 4,200+ feet of 4" white thermoplastic line, 890 sq yd of new concrete sidewalk, 1,300 ft of straight curb) - Unique/Notable Requirements: - Strict adherence to City of Worcester and MassDOT construction standards - Coordination with utility companies for infrastructure adjustments - Comprehensive documentation of underground infrastructure - Environmental and safety compliance throughout construction - No specific OEMs or proprietary vendors are named; materials must meet public works specifications.
Description
This solicitation is for complete street construction improvements at various locations within the City of Worcester as per the attached plans and specifications of the Department of Transportation & Mobility. The project includes work at multiple specified locations such as Franklin Street/Norfolk Street/Suffolk Street, Pleasant Street/Tiverton Parkway/Mill Street, and others. The estimated cost for the project is $1,400,000.00. Bidders are expected to follow detailed plans and specifications provided in the bid documents.