Opportunity

La Habra Planet bids #2-R-25

Alley Improvement Project, Area No. 7, FY2023-2024 for the City of La Habra

Posted

September 04, 2026

Respond By

September 17, 2026

Identifier

2-R-25

NAICS

237310, 238990

The City of La Habra Community Development department is seeking bids for the Alley Improvement Project, Area No. 7, FY2023-2024 (Project No. 2-R-25). - Government Buyer: - City of La Habra, Community Development Department - Scope of Work: - Complete alley rehabilitation including: - Mobilization and demobilization - Storm water best management practices (BMPs) - Construction survey and monumentation - Traffic control for public safety - Excavation and disposal of subgrade material - Construction of 6" Portland Cement Concrete (PCC) pavement, curbs (with and without weep holes), curb ramps with detectable warning surfaces - Asphalt pavement repairs - Header boards with stakes - Alley approaches, sidewalks, watertight manhole frames and covers - Adjustments to sewer manholes, water meter boxes, and sewer clean outs - Tree stump removal and root pruning - Removal and replacement of unsuitable material - Driveway construction - Products/Services Requested: - No specific OEMs or proprietary products are named; all materials and equipment must meet project specifications - Quantities include 26,535 sq ft of 6" PCC pavement, 1,768 sq ft of alley approach, 647 sq ft of sidewalk, 500 sq ft of driveway, and other line items as detailed - Unique Requirements: - Contractors must hold a valid A or C-8 license - All work must comply with provided plans, specifications, and contract documents - Project duration is 40 working days; $1,000 per calendar day liquidated damages for delays - Bids must be submitted electronically via the City’s Planet Bids portal; no mailed, faxed, or hand-delivered bids accepted

Description

This project involves furnishing all materials, equipment, tools, labor, and incidentals required for the alley improvement in Area No. 7. The scope includes mobilization, storm water best management practices, excavation and disposal, construction of PCC pavement, curbs, curb ramps with detectable warning surfaces, asphalt pavement, header boards, alley approaches, sidewalks, watertight manhole frames and covers, tree stump removal, root pruning, removal and replacement of unsuitable material, and driveway construction. The work must comply with the provided plans, specifications, and contract documents. The project requires a license type A or C-8 and has a duration of 40 working days with liquidated damages of $1,000 per calendar day.

View original listing