Opportunity

CanadaBuys #PEIG-DTI-7244

Roseville Bridge Structure Replacement Solicitation – Prince Edward Island

Posted

September 02, 2026

Respond By

September 17, 2026

Identifier

PEIG-DTI-7244

NAICS

237310, 237990

The Province of Prince Edward Island's Department of Transportation and Infrastructure is seeking competitive bids for the complete replacement of the Roseville Bridge structure. - Government Buyer: - Department of Transportation and Infrastructure, Province of Prince Edward Island - Minister of Transportation and Infrastructure - Scope of Work: - Full demolition and removal of the existing bridge - Construction of a new timber bridge structure - Extensive sitework including excavation, slope protection, environmental controls, and landscaping - Installation of steel piles, pipe piles, concrete formwork and reinforcement, cast-in-place concrete, timber components, structural steel barriers, rip rap, gabion baskets, and asphalt paving - Products and Materials Requested: - Detailed line items include: clearing, grubbing, excavation (muck, earth waste, pavement), borrow materials, granular base, gravel, backfill, fine grading, topsoil, rip rap (multiple grades), filter fabric, asphalt cement, tack coat, asphalt base and seal, cold planing, hydroseeding, environmental controls, signallers, guardrail removal and erection, traffic control devices, cast-in-place and cast-and-place concrete, concrete reinforcement, demolition, bearing pads, concrete barriers, miscellaneous metals, mobilization/demobilization, gabion baskets, project layout, steel and pipe piles (supply and drive), timber lagging, stringers, decking, and curbing - Quantities and part numbers are specified for each item (e.g., 5500 m³ earth waste, 500 tonnes granular base, 480 m guardrail removal/erection, 4 bearing pads, 906.75 m timber stringers) - Unique/Notable Requirements: - Compliance with CSA S6-19 (CHBDC) standards and departmental specifications; most stringent clauses apply in case of conflict - Environmental permits and occupational health and safety regulations must be met - Project must be open to traffic by completion milestone, with remaining work scheduled for spring - No specific OEMs or vendors are named; bidders must supply all labor, equipment, and materials - Contract duration is 110 working days, split between main construction and spring completion phase - Procurement is open under the Canadian Free Trade Agreement (CFTA)

Description

This solicitation is for the complete replacement of the existing bridge structure in Roseville. The work includes supplying all labor, equipment, and materials necessary for excavation, slope protection, environmental controls, asphalt excavation, demolition and removal of the existing structure, installation of steel piles, concrete formwork and reinforcement, cast-in-place concrete, new timber structure, structural steel barrier, rip rap, gabion baskets, road work with asphalt paving, and all other ancillary tasks required to complete the installation to the satisfaction of the owner. The contract duration is estimated at 4 months. The procurement method is competitive open bidding under the Canadian Free Trade Agreement (CFTA).

View original listing