Opportunity

North Carolina eVP #294-274-09022026

Trenchless Gravity Sewer Line Repair – Fiberglass CIPP Sleeves and Site Services for City of Havelock

Posted

September 02, 2026

Respond By

October 07, 2026

Identifier

294-274-09022026

NAICS

237110, 237990

The City of Havelock, North Carolina, is soliciting bids for trenchless repair of gravity sewer lines at two locations: Forest Hill Drive (between manholes TH32 and TH33) and Shepard Street (between manholes P76 and P79). - Government Buyer: - City of Havelock, Finance Director: Kimberly Walters - Project Scope: - Trenchless repair of gravity sewer lines using fiberglass CIPP (Cured-In-Place Pipe) repair sleeves - Four sleeves for 10-inch ductile iron pipe (Forest Hill Drive) - Two sleeves for 8-inch ductile iron pipe (Shepard Street) - Products & Services Requested: - Fiberglass CIPP repair sleeves (6 total; 4 for 10-inch, 2 for 8-inch pipes) - Bypass pumping equipment and services (using a Vactor truck) - Traffic control services (lane closures, NCDOT compliance) - Erosion and sediment control materials and services (NC DEQ standards) - Site restoration after repairs - Unique Requirements: - Confined space entry procedures per OSHA - Submission of a traffic control plan - Compliance with E-Verify, Iran Divestment Act, and Companies Boycotting Israel statutes - One-year warranty on materials and workmanship - Liquidated damages of $300 per day for delays - No specific OEMs are named; bidders may propose equivalent products meeting quality standards - Performance period is 45 calendar days from Notice to Proceed; work hours are Monday-Friday, 8am-5pm, excluding City holidays

Description

The City of Havelock is soliciting bids for trenchless repair of gravity sewer line sections at two locations: Nunn Street near 413 Forest Hill Drive and the intersection at McCotter Boulevard, and between manholes P79 and P76 on Shepard Street. The project involves installing fiberglass CIPP repair sleeves to fix infiltration issues in ductile iron pipes. The contractor is responsible for bypass pumping, traffic control, erosion and sediment control, site restoration, and compliance with safety and regulatory requirements. The performance period is 45 calendar days from the Notice to Proceed.

View original listing