PIEE #W9126G26RA109
Site Improvements and Utility Upgrades at Stillhouse Hollow Lake, Texas
Buyer
W076 ENDIST FT WORTH
Posted
August 24, 2026
Respond By
September 21, 2026
Identifier
W9126G26RA109
NAICS
238990, 237110, 237130, 237990, 237310
The U.S. Army Corps of Engineers, Fort Worth District, is seeking a contractor for site improvements and utility upgrades at Stillhouse Hollow Lake, Texas. - Government Buyer: - U.S. Army Corps of Engineers, Fort Worth District (W076 ENDIST FT WORTH) - Scope of Work: - Installation of approximately 1,000 linear feet of electric line with service disconnects - Installation of one breaker box and nine 100-amp pedestals - Installation of 2,000 linear feet of sewer line and a lift station - Installation of 1,700 linear feet of waterline for nine RV sites - Placement of 10,000 square feet of concrete and 2,000 square yards of asphalt paving - Optional Work Items: - Construction of a new concrete road approach with integrated culvert and headwall - Installation of a 16-foot dual-swing gate system with reinforced concrete - Placement of No Parking Towing Enforced signage and pavement markings - Requirements: - Contractor must furnish all tools, equipment, materials, labor, and supervision - OEMs and Vendors: - No specific OEMs or vendors are mentioned in the solicitation - Unique/Notable Requirements: - Includes both utility upgrades and site improvements for RV sites - Optional items add flexibility for road and access enhancements
Description
-------AMENDMENT 0001 to UPDATE SITE VISIT: SITE VISIT IS NOW SCHEDULED FOR 27 AUGUST 2026 at 9:00 AM. Location remains the same at 3740 FM 1670, Belton, TX 76513. ------------- SUBJECT: SITE IMPROVEMENTS, STILLHOUSE HOLLOW LAKE, TEXAS; DESCRIPTION: PROPOSED SOLICITATION NUMBER - W9126G26RA109, POSTED ON OR ABOUT 18 AUGUST 2026. CLOSING RESPONSE DATE: PRE-SOLICITATION CLOSE DATE OF 18 AUGUST 2026; ESTIMATED SOLICITATION CLOSING DATE OF 18 SEPTEMBER 2026. DESCRIPTION: The contractor shall furnish all tools, equipment, materials, labor, and supervision necessary to repair utilities and perform upgrades at Stillhouse Hollow Lake. The base work includes the installation of approximately 1,000 linear feet of electric line with service disconnects, one (1) breaker box and nine (9) 100-amp pedestals, approximately 2,000 linear feet of sewer line, a lift station, approximately 1,700 linear feet of waterline to accommodate nine (9) RV sites, approximately 10,000 square feet of concrete and approximately 2,000 square yards of asphalt paving. Optional work items include the construction of a new concrete road approach (IRRM Approach) with integrated culvert and headwall, installation of a 16-foot dual-swing gate system with an additional 1,600 square feet of reinforced concrete, and the installation of No Parking Towing Enforced signage and pavement markings across the project areas.