Opportunity
SAM #N0038326QTC80
Repair and Overhaul of NRP, FWD RH FITTNG D for NAVSUP Weapon Systems Support Philadelphia
Buyer
NAVSUP WEAPON SYSTEMS SUPPORT
Posted
September 03, 2026
Respond By
October 05, 2026
Identifier
N0038326QTC80
NAICS
336413
NAVSUP Weapon Systems Support Philadelphia, under the Department of the Navy, is seeking repair and overhaul services for the item NRP, FWD RH FITTNG D. - Government Buyer: - NAVSUP Weapon Systems Support Philadelphia (Department of the Navy) - OEM Highlight: - The Boeing Company is the Original Equipment Manufacturer (OEM) - Products/Services Requested: - Repair, overhaul, upgrade, testing, and inspection of NRP, FWD RH FITTNG D - Part number: 8090201867-20 - NSN: 1710 016577426 - Quantity: Not specified - Notable Requirements: - All work must comply with Boeing's latest drawings and specifications - Contractor must provide all facilities, labor, materials, parts, and test equipment - Item must be restored to Ready For Issue (RFI) condition - Compliance with MIL-STD-130 for markings, ISO 9001/SAE AS9100 quality management, ANSI/NCSL Z540.3 calibration standards, and MIL-STD 2073 packaging - Repair turnaround time (RTAT) is 180 days after receipt of asset - Induction expiration is 365 days after contract award - Early and incremental deliveries are accepted and preferred - Contractor must maintain configuration management and process control documentation - Government approval required for any changes to manuals, drawings, specifications, or repair sources
Description
CONTACT INFORMATION Location Code: 4 Item Number: N791.13 Type: T1N Phone: 771-229-0606 Email: Destiny.n.wiatr.civ@us.navy.mil ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT 8 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) Invoice and receiving report: TBD Schedule Number: N00383 Details: SEE SCHEDULE NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) Number: 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE Number: 1 Contact: Destiny Wiatr EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) Number: 4 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) Number: 11 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) Number: 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) Number: 5 BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) Number: 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) Number: 13 ROYALTY INFORMATION (APR 1984) Number: 1 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) Number: 2 Status: x Repair Turnaround Time (RTAT) Definition: The contractual delivery requirement is measured from asset return to the date of asset acceptance under the terms of the contract. Return is defined as the physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date in the Commercial Asset Visibility (CAV) system. The contractor must report all transactions accurately by the end of the fifth business day after receipt, and the Action Date in CAV must reflect the actual physical receipt date. The contractor must obtain final inspection and acceptance by the Government within the RTAT established in the subsequent contract. Required RTAT: 180 days after receipt of asset Throughput Constraint: The contractor must provide a throughput constraint for each NSN(s). Total assets to be repaired monthly after initial delivery: X/month (contractor to fill in number). A throughput of ____ per month indicates no throughput constraint. Induction Expiration Date: 365 days after the contract award date. Assets received after this date are not authorized for repair without bilateral agreement between the contractor and NAVSUP WSS Contracting Officer. Reconciliation: A modification will be issued after final inspection and acceptance of all assets inducted under the subsequent contract. Prices are based on meeting RTAT requirements. If not met, consideration will be assessed and negotiated. All contractual documents are considered issued by the Government when copies are deposited in the mail, transmitted by facsimile, or sent by electronic methods such as email. The Government's acceptance of the proposal constitutes a bilateral agreement to issue contractual documents as detailed. Early and incremental deliveries are accepted and preferred. 1. Scope Markings shall comply with MIL-STD-130. Articles shall be manufactured, tested, and inspected according to Boeing drawing 81205, Revision Latest, and all referenced specifications. Equipment such as fixtures, jigs, dies, patterns, and test equipment are the contractor’s responsibility unless otherwise specified. If MIL-STD-454 is referenced, compliance with IPC/EIAJ-STD-001C is expected. 2. Applicable Documents Not applicable. 3. Requirements 3.1 General This SOW establishes repair, testing, inspection, component repair, replacement, reassembly, and testing criteria to return units to a serviceable condition. 3.2 Definitions Contractor: The successful offeror awarded a contract, order, or project work order. Overhaul: Disassembled, cleaned, inspected, repaired, reassembled, tested, and returned to RFI condition per the repair/overhaul manual. Repair: Restored to RFI condition by replacing or repairing defective components and tested accordingly. 3.3 Scope The items shall be overhauled, upgraded, repaired, tested, inspected, and accepted per contract terms. Government-furnished property is not provided unless specified. Repair/upgrade requirements include providing necessary facilities, labor, materials, parts, and test equipment to return items to RFI. RFI is defined as items capable of proper and reliable operation in an operational environment. Repairs must be performed at the designated facility and in accordance with the specified drawings and manuals. Changes to manuals, drawings, or specifications require PCO approval. Unapproved changes performed at the contractor's risk; disapproved changes must be replaced at the contractor's expense. References on drawings/specifications should read