Opportunity
SAM #PR498396
Oak Ridge National Laboratory solicits complete ICP-OES system with installation, training, and warranty
Buyer
UT-Battelle
Posted
September 02, 2026
Respond By
September 09, 2026
Identifier
PR498396
NAICS
334516, 334519
Oak Ridge National Laboratory (ORNL), operated by UT-Battelle, LLC under the U.S. Department of Energy (DOE), is soliciting proposals for a complete Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) system for quantitative multi-element analysis of environmental, geological, and aqueous samples. - Government Buyer: - U.S. Department of Energy - Oak Ridge National Laboratory - Commercial Group, Contracts Division, Business Services Directorate - Products Requested: - One complete ICP-OES system - Includes instrument, automated liquid autosampler, computer workstation with software licenses, initial consumables/accessories, and shipping/delivery - Must support high-matrix samples, axial and radial plasma viewing, broad wavelength coverage, and robust sample introduction - Calibration certification and operating/maintenance manuals required - Services Requested: - Installation and instrument checkout by manufacturer-authorized service engineer - On-site operator training covering operation, method development, maintenance, troubleshooting, and software - Notable Requirements: - Minimum one-year manufacturer warranty - Delivery required by September 22, 2026 - Small business set-aside under NAICS code 334516 - Proposals must include on-site training and calibration certification - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation or attachments - Potential OEMs (based on industry knowledge): - Thermo Fisher Scientific, Agilent Technologies, PerkinElmer, Shimadzu, Spectro Analytical Instruments
Description
Oak Ridge National Laboratory requires one new, complete Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) system for quantitative multi-element analysis of environmental, geological, and aqueous samples. This shall include installation and training. Technical requirements are specified in Attachment B Shipped and documented before 09/24/26