Opportunity
Pierce County Fire Protection District 6 Opengov #2025-MPW-236
Pierce County 224th Street East Asphalt Overlay and Curb Ramp Reconstruction Project
Posted
September 02, 2026
Respond By
September 30, 2026
Identifier
2025-MPW-236
NAICS
237310
Pierce County Planning & Public Works is seeking bids for the 224th Street East Asphalt Overlay and curb ramp reconstruction project in Tacoma, WA. - Government Buyer: - Pierce County Planning & Public Works, Office of the County Engineer, Transportation Improvement Section - Project Scope: - Resurfacing 224th Street East with Hot Mix Asphalt (HMA) from east of State Route 7 to 70th Avenue East - Removal and replacement of non-compliant cement concrete curb ramps and sidewalks - Traffic signal system modifications, including installation of video detection cameras, vehicle detection systems, and junction box replacements - Utility adjustments for valves, meter boxes, and junction boxes - Installation and removal of permanent and temporary pavement markings, including raised pavement markers, crosswalks, stop lines, arrows, and letters - Catch basin and sanitary sewer structure adjustments with ADA-compliant grates - Erosion control measures such as straw mulch, seeding, fertilizing, and topsoil - Monument installation and adjustment - Permanent and temporary signing, construction signage, and traffic control devices - Traffic control management including flaggers, uniformed law enforcement personnel, and portable changeable message signs - Roadway excavation, pavement repair, and approach finishing - Utility coordination and roadside cleanup - Products & Quantities: - Hot Mix Asphalt (HMA) CL 1/2 IN. PG58H-22: 7,550 tons (overlay), 173.9 tons (repair) - Crushed Surfacing Base Course: 80 tons (main), 10.7 tons (repair) - Crushed Surfacing Top Course: 210 tons (main), 98.1 tons (repair) - Cement Concrete Sidewalk: 121 square yards (main), 540 square yards (additional) - Cement Concrete Curb Ramp Type Parallel: 10 each - Raised Pavement Marker Type 1: 1,040 hundred units; Type 2: 580 hundred units - Paint Line: 45,301 linear feet; Painted Wide Line: 935 linear feet - Plastic Crosswalk Line: 540 square feet; Plastic Stop Line: 107 linear feet; Plastic Traffic Arrow: 17 each; Plastic Traffic Letter: 8 each - Construction Signs Class A: 119 square feet - Temporary Pavement Marking - Short Duration: 49 each; Miscellaneous Markings: 1,980 linear feet; Temporary Stop Line: 1,080 linear feet; Temporary Crosswalk Line: 1,080 linear feet - Traffic Signal System Modifications: 1 lump sum - Utility Coordination: 1 lump sum - Mobilization: 1 lump sum - Flaggers: 1,080 hours; Other Traffic Control Labor: 130 hours; Uniformed Law Enforcement Personnel: 100 hours; Portable Changeable Message Sign: 1,800 hours - Roadside Cleanup: $2,000 - Notable Requirements: - Compliance with federal wage rates and Buy America provisions - 14% Federal Small Business Enterprise (FSBE) participation goal - Encouragement of recycled materials and reporting of recycled content - Liquidated damages for delays; operational testing of traffic signal systems required before final acceptance - Proposal guaranty of 5% of bid - No specific OEMs or named vendors; bidders must supply materials and services meeting project specifications - Estimated contract value: $1,250,000 to $2,000,000 - Project duration: 45 working days
Description
This project involves the improvement of 224th Street East from east of State Route 7 to 70th Avenue East in Pierce County, Washington. The work includes resurfacing the roadway with Hot Mix Asphalt, reconstructing curb ramps, and other related tasks as detailed in the plans and specifications. The project aims to enhance the roadway surface and pedestrian accessibility. Bidders must submit proposals electronically or by hard copy by September 30, 2026.