Opportunity
Town of Flower Mound Ionwave #2026-128-B
Forest Vista AC Water Line Decommissioning Project – Town of Flower Mound
Posted
September 01, 2026
Respond By
October 08, 2026
Identifier
2026-128-B
NAICS
237110
This opportunity involves the Town of Flower Mound, Texas, seeking bids for the Forest Vista AC Water Line Decommissioning project. - Government Buyer: - Town of Flower Mound, Purchasing Office - OEMs and Vendors: - DFW Plastics, Inc. (water meter boxes and lids) - Products and Services Requested: - Decommissioning of approximately 1,500 linear feet of 6-inch asbestos cement (AC) water pipe - Relocation of water meters to the right-of-way (ROW) line - Installation of new service pipes to each customer - Installation of water meter boxes and lids (DFW Plastics, Inc.) - Mobilization, traffic control, site preparation, erosion and sediment control (SWPPP), project signage - Installation of topsoil (320 units), block sod (320 units), gate valves (2-inch: 2 units; 12-inch: 1 unit), water meters (1-inch: 3 units), domestic water meter boxes (4 units) - Installation of private and public water services (1-inch: 2 units; 1.5-inch: 1 unit; 2-inch: 2 units) - Bullhead (dual-branch) service connections (2 units) - Removal, salvage, and delivery of 6-inch valve (1 unit) - Cutting and plugging existing water main (2 units) - Unique or Notable Requirements: - Bid bond of at least 5% of total bid - Compliance with Town of Flower Mound standards and North Central Texas Council of Governments specifications - Prevailing wage rates, performance, payment, and maintenance bonds with a two-year warranty period - Hard copies of plans/specifications available for a fee - Strict adherence to instructions for bid submission - Engineer's estimate for the project is $77,000 - Substantial completion required within 45 days, final completion within 60 days, and a two-year maintenance bond period after acceptance
Description
The Town of Flower Mound is soliciting sealed bids for the Forest Vista AC Water Line Decommissioning project. The scope includes decommissioning approximately 1,500 linear feet of existing 6-inch AC pipe from Forest Vista Sr. North along the east property line of Stone Creek Addition (Phase III) to Princewood Drive, relocating meters to the right-of-way line, and installing service pipes to each customer as detailed in the plans. Bidders must comply with all instructions and submit all required proposal pages and subcontractor qualifications. The engineer's estimate for the project is $77,000.