Opportunity

Nevada Ionwave #2026-10 Addendum 2

UMC MLK Warehouse Remodel – Lighting, Plumbing, and Facility Upgrades

Posted

August 21, 2026

Respond By

September 18, 2026

Identifier

2026-10 Addendum 2

NAICS

236220, 238210, 238220, 238290

The University Medical Center of Southern Nevada (UMC) is seeking bids for a comprehensive remodel of its MLK Warehouse in Las Vegas, covering approximately 35,309 square feet. - Government Buyer: - University Medical Center of Southern Nevada (UMC), Contracts Management Division - Scope of Work: - Demolition of existing flooring and finishes - Refresh of office and warehouse finishes - Upgrades to electrical and data systems, including installation of new access points for workstations - Mechanical and plumbing improvements, including new sinks, faucets, toilets, urinals, and drinking fountains - Installation of new lighting fixtures (LED troffers, downlights, exit signs) - Coordination for fire detection systems, telemetry antennas, Centrak devices, and wireless access points - OEMs and Brand Standards (highlighted): - Metalux (Cooper Lighting Solutions): LED troffers and lighting fixtures - Halo Commercial (Cooper Lighting Solutions): LED downlights - Sure-Lites: Exit signs - Kohler: Sinks and faucets - Moen: Kitchen faucet - Insinkerator: Garbage disposal - American Standard: Toilets and urinals - Sioux Chief: Mixing valves and wall supply boxes - Zurn: Floor drains - JR Smith: Wall cleanouts - Halsey Taylor: Drinking fountains - Schlage: Door hardware - Von Duprin: Exit devices - LCN: Door closers - Select: Continuous hinges - Dunn Edwards and Sherwin-Williams: Paints - Notable Requirements: - Strict adherence to 2024 building, fire, energy, plumbing, accessibility, and electrical codes - Contractors must have experience working in operational hospital environments - Infection control compliance, including containment and negative air filtration - Work to be performed during daytime hours (Monday-Friday) - Coordination with UMC for fire detection and specialized device handling - Compliance with Nevada prevailing wage, safety, bonding, and insurance requirements

Description

This solicitation is for the remodel of the UMC MLK Warehouse located at 300 S M.L.K. Blvd, Las Vegas, NV 89106, covering approximately 35,309 square feet. The work includes refreshing finishes for office space use, preparing the warehouse area according to architectural drawings, demolition of flooring, upgrades to existing light fixtures, and installation of new electrical and data access points to accommodate planned workstations. The project requires compliance with various codes and standards, and work will be performed during daytime hours Monday through Friday. A mandatory pre-bid conference is scheduled for August 31, 2026.

View original listing