Opportunity
City of Columbia Ionwave #94/2026
City of Columbia Solicits Multi-Year Supply of HDPE Storm Water Pipe (15"–60")
Posted
August 31, 2026
Respond By
September 29, 2026
Identifier
94/2026
NAICS
423390, 326122
The City of Columbia, Missouri is seeking bids for a multi-year supply of High-Density Polyethylene (HDPE) storm water application pipe for its Utilities Department at the Columbia Wastewater Treatment Plant. - Government Buyer: - City of Columbia Purchasing Division, Utilities Department - Products Requested: - HDPE storm water application pipe, diameters ranging from 15" to 60" - Estimated quantity: 300 linear feet per size - Minimum order: 20 linear feet per size - Pipe type: ADSN-12 WT IB (water tight, integral bell), smooth interior, dual wall or approved equal - Pipe joints: Bell & spigot, water tight, factory-installed elastomeric gaskets - Standards: Must conform to AASHTO M294 and ASTM D3350, D3212, F477, F2306 - Minimum 2% carbon black content - Delivery: Freight included, FOB Columbia Wastewater Treatment Plant - Pricing: Per linear foot for each diameter - OEMs and Vendors: - No specific OEMs named; products must meet technical standards and may be from any manufacturer meeting requirements - Unique Requirements: - Warranty information required for each pipe type - Contract term: Initial three months, up to nineteen three-month renewal options (total up to 5.5 years) - City reserves right to order in smaller quantities - Notable Standards: - AASHTO M294, ASTM D3350, D3212, F477, F2306 - Potential OEMs (based on industry standards): - Advanced Drainage Systems, Inc. (ADS) - JM Eagle - Lane Enterprises - Prinsco - Hancor - Delivery timing to be arranged upon order placement.
Description
This solicitation is a Request for Bid issued by the City of Columbia for the procurement of HDPE storm water application pipe. The contract covers the delivery of various sizes of HDPE pipe conforming to specified technical standards, including AASHTO M294 and ASTM requirements. The contract period includes an initial term with multiple renewal options. Bids must be submitted by September 29, 2026, and can be delivered either in sealed envelopes or electronically. The delivery location is the Columbia Wastewater Treatment Plant in Columbia, Missouri.