Opportunity

Mchenry County Granicus #26-9306

Resinous Flooring and Sanitary Wall Base Installation for McHenry County Veterinary and Public Health Building

Posted

August 31, 2026

Respond By

September 22, 2026

Identifier

26-9306

NAICS

238330

McHenry County Facilities Management, Procurement Division is seeking bids for resinous flooring installation at the Veterinary and Public Health Building in Crystal Lake, IL. - Government Buyer: - McHenry County, Illinois, Facilities Management, Procurement Division - OEMs and Materials Specified: - Dur-A-Flex (Dur-A-Glaze WB Primer, Dur-A-Glaze MVP Moisture Vapor Primer, Shop Floor Resin, Flintshot silica sand, Armor Top urethane topcoat) - Flexco Health Design Wall Base (heavy-gauge vulcanized rubber) - Dow Corning 786 biocide-grade silicone sealant - Heavy-duty polyurethane structural adhesive - Products/Services Requested: - Mechanical preparation of existing epoxy-coated concrete floors - Substrate repair and moisture vapor mitigation - Installation of double-broadcast slip-resistant polyurethane/epoxy hybrid flooring system - Installation of heavy-duty sanitary wall base in service corridors and cold food prep areas - Removal and replacement of sanitary wall base - Unique/Notable Requirements: - Factory-certified installers with at least five years of experience - Mandatory site visit and electronic bid submission - Phased project schedule to allow continued facility operations - Compliance with institutional sanitation protocols - Bidders must provide schedule, references, certifications, and bid bond - SAM.gov registration required (federally funded project) - Completion by specified deadline; warranty period for materials and labor is one year from completion

Description

McHenry County is soliciting bids for resinous flooring installation at the McHenry County Veterinary and Public Health Building located at 100 North Virginia Street, Crystal Lake, IL. The project involves mechanical preparation of existing epoxy floors, substrate repair, and installation of a high-durability double-broadcast slip-resistant polyurethane/epoxy hybrid flooring system with a sanitary base. The work must be completed by December 14, 2026, and includes a mandatory site visit and electronic bid submission.

View original listing