Opportunity
Brazos Valley Ionwave #037-11-26
Bryan Texas Utilities Rayburn-East 69kV Transmission Line Reroute Construction Project
Posted
August 31, 2026
Respond By
September 30, 2026
Identifier
037-11-26
NAICS
237130, 237990
Bryan Texas Utilities (BTU) is seeking bids for the Rayburn-East 69kV Transmission Line Reroute Construction Project, which involves rerouting and constructing a 69kV overhead transmission line in Bryan, Texas. - Government Buyer: - Bryan Texas Utilities (BTU), City of Bryan, Texas - OEMs and Vendors: - CHM (Tubular steel structures) - Ohio Brass (Transmission line insulators) - Maclean (Transmission line insulators) - AFL (Fiber optic ground wire) - Preformed Line Products (VORTX dampers) - Products Requested: - Prestressed spun concrete transmission poles (14 units, various types/sizes) - Tubular steel transmission poles (6 units, CHM, various sizes) - Polymer post and braced post insulators (Ohio Brass, Maclean; part numbers: P250053S0030, S050047S2010, P300053S0020, S050047S2020, B291076AL48A, S298092VA10, H291076VA04; total 120 units) - ACSR transmission conductors (Drake, Curlew, Bittern; 49,400 feet total) - Overhead shield wire (EHS, 3/8", 2,300 feet) - Fiber optic ground wire (AFL OPGW AC-39/43/646, AC-64/528; 13,000 feet total) - Transmission and distribution hardware (as per bill of materials and drawings) - Dampers (Preformed Line Products VORTX) - Services Requested: - Transmission line construction (pole installation, wire installation/removal, structure removal, foundation construction) - Geotechnical engineering and foundation installation - Permitting and traffic control (TxDOT coordination) - Mobilization/Demobilization - Nighttime work (off-peak construction, ERCOT line clearances) - Unique/Notable Requirements: - Owner-furnished materials with specified delivery windows - Mandatory pre-bid meeting - Nighttime work multipliers for off-peak construction - Coordination with TxDOT for permits and traffic management - Compliance with ERCOT-approved line clearances and installation procedures - Detailed geotechnical engineering reports and construction drawings provided - Quantities and part numbers for major components specified in bid documents and appendices
Description
This solicitation is a request for bid issued by Bryan Texas Utilities for the Rayburn-East 69kV Reroute Project involving transmission line construction. The project includes rerouting the 69kV transmission line with construction activities such as pole installation, wire installation and removal, structure removal, and miscellaneous related work. A mandatory pre-bid meeting is scheduled, and detailed bid documents and attachments including drawings, geotechnical reports, and material specifications are provided. The bid submission deadline is September 30, 2026, at 2:00 PM CST.