Opportunity

CanadaBuys #WSC-2627-102

Boiler Stack Replacement at AAFC Summerland Research and Development Centre

Posted

August 31, 2026

Respond By

September 16, 2026

Identifier

WSC-2627-102

NAICS

238290

Agriculture and Agri-Food Canada (AAFC) is seeking qualified contractors for a boiler stack replacement project at the Summerland Research and Development Centre in British Columbia. - Government Buyer: - Agency: Agriculture and Agri-Food Canada (AAFC) - Sub-agency: Western Service Centre - Office: AAFC Summerland Research and Development Centre - Scope of Work: - Removal of the existing common chimney system serving two natural gas-fired heating water boilers (each rated at 860kW) - Installation of a new ULC-listed manufactured chimney system, approximately 15 meters high, compliant with CSA B149.1 standards - Structural supports for the new chimney - Installation and flashing of a new roof thimble - Installation of motorized flue dampers interlocked to boiler control - Modifications to insulation in the boiler room - Procurement Process: - Two-phase process: Phase One evaluates supplier qualifications; Phase Two invites qualified suppliers to submit financial bids - Unique Requirements: - All regulated gas work must be performed by contractors authorized in British Columbia - Personnel must hold a Class A gas fitters certificate as per the BC Gas Safety Regulation - OEMs and Vendors: - No specific OEMs, brands, or part numbers are mentioned in the solicitation - Products/Services Requested: - Boiler stack replacement and associated installation services - No specific product line items or part numbers provided - Notable Technical Standards: - Chimney system must be ULC-listed and compliant with CSA B149.1 - Work must be completed by certified gas installation mechanics (Category A) authorized in British Columbia

Description

Agriculture and Agri-Food Canada (AAFC) Summerland Research and Development Centre in Summerland, BC, requires the replacement of an existing chimney system serving two natural gas-fired heating water boilers (860kW each). The new ULC-listed chimney, approximately 15 meters high, must comply with CSA B149.1 standards and include structural supports. The work includes roof thimble installation, motorized flue dampers interlocked to boiler control, and insulation modifications in the boiler room. The contract duration is approximately 7 months, with completion required by May 31, 2027.

View original listing