The City of Joplin, Missouri is seeking bids for the Willow Branch Culvert Replacement project on Wall Avenue (6th to 7th Streets). - Project scope includes replacing the Old Willow Branch storm system with new storm sewer infrastructure. - Key construction elements: - 441 linear feet of 12’x4’ reinforced concrete box storm sewer - 53 linear feet of 18” reinforced concrete pipe - 4 Type ‘C’ curb inlets - 1 3’x3’ junction box - 869 tons of crushed stone base - 1,973 square yards of 8” asphaltic concrete base - 2” asphaltic concrete surface - 865 linear feet of curb and gutter - 5,219 square feet of concrete sidewalk - 401 square feet of ADA concrete sidewalk ramp - 236 square yards of driveway construction - 1,681 square feet of brick pavers - 531 cubic feet of Silva Cell - Miscellaneous construction work is also required. - Completion must occur before the MoDOT 7th Street storm sewer project begins at Wall and 7th Street. - No specific OEMs or vendors are named in the solicitation. - Plans and specifications are available for purchase; a mandatory pre-bid meeting is required.
Description
This project involves the replacement of the existing Old Willow Branch storm system on Wall Avenue from 6th Street to 7th Street. The work includes installation of reinforced concrete box storm sewer, reinforced concrete pipe, curb inlets, junction box, crushed stone base, asphaltic concrete base and surface, curb and gutter, concrete sidewalk and ramps, driveway construction, brick pavers, Silva Cell, and other miscellaneous work. The project is the downstream section of the Willow Branch stormwater project and must be completed prior to the MoDOT 7th Street storm sewer project at Wall and 7th Street. A mandatory pre-bid meeting is scheduled, and plans and specifications are available for purchase.