Opportunity

Louisa County Civicplus #IFB# WA-27-03

Replacement of 40,100 Linear Feet of Water Main and Associated Components for Louisa County Water Authority

Posted

August 28, 2026

Respond By

September 29, 2026

Identifier

IFB# WA-27-03

NAICS

237110

Louisa County Water Authority is seeking contractors for a major water infrastructure replacement project in the Northeast Creek Water System. - Government Buyer: - Louisa County Water Authority (LCWA), County of Louisa, Virginia - Finance Department, 2nd Floor - Project Scope: - Replacement of approximately 40,100 linear feet of 12-inch ductile iron water main with C-900 PVC water line - Work divided into five phases, with quantities specified per phase - Installation of new water main, gate valves, valve boxes, fire hydrants, air release valve assemblies, and water service connections (ranging from 3/4-inch to 6-inch) - Removal of existing water main and reconnection of existing water services - Installation and removal of temporary water bypass system and services during construction - Products Requested: - 12-Inch C-900 PVC Water Main (total: 40,100 LF) - 12-Inch Gate Valve, Valve Box (total: 50 units) - Fire Hydrant (total: 100 units) - Air Release Valve Assembly (total: 75 units) - Water Service Connections: 3/4-inch (100), 1-inch (125), 1 1/2-inch (110), 2-inch (45), 3-inch (30), 4-inch (25), 6-inch (25) - Notable Requirements: - Compliance with LCWA standards and Virginia Department of Transportation (VDOT) permits - Contractor licensing per Virginia law - Mandatory pre-bid conference - OEMs and Vendors: - No specific OEMs or vendors named; C-900 PVC pipe and related components are industry-standard - Unique Aspects: - Large-scale, phased water main replacement with detailed component requirements - Temporary water bypass system required to maintain service during construction

Description

The Louisa County Water Authority (LCWA) is seeking bids from qualified contractors to replace approximately 40,100 linear feet of 12-inch ductile iron water main. The project includes associated interconnections, hydrants, meter installations, appurtenances, removal of existing water main, and reconnection of existing water services. A portion of the replacement requires installation and removal of a temporary water bypass system and temporary services. The new water main will be C-900 PVC water line.

View original listing