Opportunity

City of Temple Terrace Demandstar #RFP-26-007-0-2026/ap

Lift Station Sierra Bravo Improvements Project for City of Temple Terrace, FL

Posted

August 28, 2026

Respond By

October 01, 2026

Identifier

RFP-26-007-0-2026/ap

NAICS

237110, 237990, 238290

The City of Temple Terrace, FL is seeking proposals for a comprehensive upgrade of the Lift Station Sierra Bravo (SB) at 7403 Harney Road. - Project scope includes: - Demolition of existing site structures and equipment - Sewage bypass pumping during construction - Installation of a polymer concrete manhole - Installation of submersible sewage pumps and mixer - Prefabricated, climate-controlled electrical building - New electrical system, PLC controls, and VFD motor drives - Generator and fuel tank installation - Stormwater improvements, paving, and fencing - Electrical and water connections to odor control and chemical feed systems (supplied by others) - Coordination with TECO for a new electrical feed - Coating the overflow wet well as an add-alternate - Notable vendors mentioned: CEC Motor & Utility Services, LLC, CJ's Power Systems, Sales & Service, Ferreira Construction Company Inc., Flotek LLC, Midsouth Inc., Ocala Fence LLC, Power & Pumps, Inc., razorback LLC., SanPik, Southeastern Surveying and Mapping Corporation, Southern States Excavating Inc, The Kearney Companies, V&A Consulting Engineers Company (WBE), Witt Fence Co. - Opportunity distributed via DemandStar with electronic plan documents available for download. - Emphasis on installation of OEM equipment such as submersible pumps, mixers, PLC controls, and VFD motor drives.

Description

The Lift Station Sierra Bravo (SB) Improvements project involves a complete refit of the existing pump station located at 7403 Harney Road in Temple Terrace, FL. The work includes demolition of site structures and equipment, sewage bypass pumping, installation of polymer concrete manhole, piping, submersible sewage pumps and mixer, a prefabricated climate controlled electrical building, new electrical system, PLC controls, VFD motor drives, generator, fuel tank, stormwater improvements, paving, fencing, and electrical and water connections to odor control and chemical feed systems supplied by others. Coordination of a new electrical feed by TECO is also required. Coating the overflow wet well is included as an add-alternate.

View original listing