Opportunity

City of Santa Rosa PlanetBids #145103

Santa Barbara County Public Works seeks bids for construction of a metal cover structure for Ultra Filtration (UF) skid area

Posted

August 14, 2026

Respond By

September 03, 2026

Identifier

145103

NAICS

238190, 237110

Santa Barbara County Public Works, via the Laguna County Sanitation District (LCSD), is requesting bids for the construction of a metal cover structure for the Ultra Filtration (UF) skid area at its wastewater treatment plant. - Government Buyer: - Santa Barbara County Public Works Department - Laguna County Sanitation District (LCSD) - OEMs and Vendors: - Varco Pruden (VP) specified for metal panel systems (or approved equal) - Products/Services Requested: - Steel-framed metal covering structure (approx. 50 ft x 15 ft) - Includes fabrication, installation, and anchorage - Removable metal sheet panels matching Varco Pruden (VP) or equivalent - Structural supports, posts, footings, and anchorage - All steel members must comply with ASTM A36 or A572 standards - Unique/Notable Requirements: - Structure must meet California Building Code requirements for wind, seismic, and gravity loads - Shop drawings and structural calculations must be prepared by a California-licensed Professional Engineer - Contractor must verify field measurements and coordinate with LCSD staff to avoid operational disruptions - Prevailing wage rates apply; payment bond required for work over $25,000 - No electrical work included - Completion required within 60 calendar days from Notice to Proceed

Description

The Laguna County Sanitation District (LCSD) is requesting informal bids for the construction of a new metal covering structure over the existing Ultra Filtration (UF) skid area. The scope includes fabrication, installation, and anchorage of a steel frame and removable metal sheet panels as detailed in the project plans. The project aims to provide weather protection for the UF skid equipment while maintaining access for maintenance and operations. The metal cover structure must be designed to withstand applicable wind, seismic, and gravity loads per the California Building Code. The work is to be completed within 60 calendar days of the Notice to Proceed, with prevailing wage rates applying and a payment bond required for work exceeding $25,000.

View original listing