Opportunity
Georgia Procurement Registry #FY27-ENGCP-001-2
Bulloch County Seeks GDOT Prequalified Contractors for Metts Road Drainage and Road Repairs
Posted
August 27, 2026
Respond By
September 18, 2026
Identifier
FY27-ENGCP-001-2
NAICS
237310, 237990, 238110
Bulloch County is seeking GDOT Prequalified Contractors for a major drainage and road repair project on Metts Road. - Buyer: Bulloch County Board of Commissioners (Engineering Department and Office of Capital Projects) - Project scope includes: - Demolition of four existing 60-inch reinforced concrete pipe (RCP) culverts - Construction of a new triple-barrel reinforced concrete box culvert (10 ft x 4 ft) - Fill slope repair, roadway shoulder repair, subgrade construction - Graded aggregate base and asphalt pavement construction - Road signing and pavement striping - Contractors must be prequalified by the Georgia Department of Transportation (GDOT) - Notable requirements: - 5% bid bond - Payment and performance bonds - Strict adherence to GDOT standards and specifications - No specific OEMs or vendors named; opportunity is open to all GDOT Prequalified Contractors - Project location: Metts Road, approximately 425 feet south of Two Chop Road, Bulloch County, GA - Completion timeline: Substantial completion within 90 days, final acceptance within 120 days after notice to proceed
Description
The Bulloch County Board of Commissioners is soliciting sealed bids from GDOT Prequalified Contractors for the FY27-ENGCP-001-2 Metts Road Drainage & Road Repairs Project. The project involves demolishing the existing four 60-inch reinforced concrete pipe culvert crossing and constructing a new reinforced concrete triple barrel 10-ft by 4-ft box culvert system. Roadway improvements include fill slope repair, shoulder repair, subgrade construction, graded aggregate base, asphalt pavement, signing, and striping. The project is located along Metts Road approximately 425 linear feet south of the intersection with Two Chop Road near coordinates Latitude 32.567414°, Longitude -81.835880°. The contractor must achieve substantial completion within 90 calendar days and final acceptance within 120 calendar days after the notice to proceed.