Opportunity

SAM #140P8126Q0051

Lift Station and Water Well Equipment Rehabilitation at Death Valley National Park

Buyer

NPS Power Plant Maintenance

Posted

August 27, 2026

Respond By

September 15, 2026

Identifier

140P8126Q0051

NAICS

237110, 238210, 238220

This opportunity from the National Park Service at Death Valley National Park seeks rehabilitation and replacement of potable water production and wastewater lift station equipment at Stovepipe Wells and Furnace Creek Campground. - Government Buyer: - National Park Service, Death Valley National Park (Department of the Interior) - Contracting Officer: Caroline Bachelier - COR: Jason Lieber - OEMs and Vendors: - Yaskawa (Variable Frequency Drives) - Environmental One (Grinder Pumps) - Liberty Pumps (Grinder Pumps) - Polywater (Conduit Penetration Sealant) - Products Requested: - Submersible well pump assemblies (complete system) - Well motor assemblies (three-phase, premium efficiency) - 15 HP, 460V, three-phase Variable Frequency Drives (basis: Yaskawa Configured IQ) - Schedule 80 rigid PVC conduit and fittings (UL 651, NEMA TC-2 compliant) - Conduit penetration sealant (Polywater FST or approved equal) - Grinder pumps (basis: Environmental One GP2600 and Liberty LSG202M) - Automatic transfer switches (UL 1008 listed) - Electrical and control equipment (surge protection, disconnects, transformers, terminal blocks, relays, contactors, alarm devices, alternators, float controls, motor starters, wiring) - Services Requested: - Startup, testing, commissioning, and operator training - Maintenance, repair, and replacement of conduit, pumps, motors, wires, and VFDs - Unique/Notable Requirements: - All equipment must be factory tested and suitable for potable water/wastewater service - Grinder pumps must have cast iron construction, hardened steel cutting assemblies, and thermal overload protection - Conduit sealant must be rated for water head pressure not less than 22 feet and allow re-entry - Electrical acceptance testing per ANSI/NETA ATS - Operator training on well operation, VFD, ATS, lift station operation, preventative maintenance, and emergency procedures - Integrated utility system commissioning with documentation and reports - Estimated contract value: $100,000 to $150,000 - Period of performance: 180 calendar days from commencement, with onsite work estimated within 180 days after Notice to Proceed - No specific quantities or part numbers for most products; technical details referenced in attachments

Description

DEVA-Conduit and Lift Station RehabilitationStovepipe Wells Production Well Coyote Loop Lift Station Furnace Creek Campground Lift Station

View original listing