Opportunity

Town of Chapel Hill #P27-04R

Legion Pond Dam Demolition and Stormwater Detention Basin Construction for Town of Chapel Hill

Posted

August 27, 2026

Respond By

September 10, 2026

Identifier

P27-04R

NAICS

237990, 237110

This opportunity involves the demolition and reconstruction of Legion Pond Dam for the Town of Chapel Hill, North Carolina, supporting a planned affordable housing development. - Government Buyer: - Town of Chapel Hill, Purchasing and Contracts Manager (Chad Brown) - Engineering firm: Tetra Tech Engineering, P.C. - Project Scope: - Dewatering the existing pond and monitoring groundwater - Demolition of dam and embankment from the top down, maintaining bypass flow - Construction of a stormwater detention basin (constructed wetland) - Installation of erosion and sediment control measures (silt fences, tree protection, ground stabilization) - Utility relocation and verification, maintaining continuous service - Restoration of disturbed areas (grading, seeding, vegetation) - Compliance with North Carolina Department of Transportation Standard Specifications - Geotechnical quality assurance and monitoring - Products and Materials: - Earth-moving equipment (excavators, loaders, dump trucks) - Dewatering plan and monitoring - Embankment fill material (CL, ML, CL-ML, SM, SC soils) - Silty sand berm and toe drain (with ASTM C33 No. 57 stone) - Filter diaphragm for spillway conduit (ASTM C33 fine aggregate filter sand) - Riprap channel protection (NCDOT Riprap Class 1, geotextile filter) - Concrete for emergency spillway - Erosion and sediment control materials - Services: - Dewatering services - Demolition services - Site restoration services - Utility relocation and verification - Erosion and sediment control installation - Geotechnical quality assurance and quality control - Control and monitoring of dewatering activities - Unique Requirements: - Licensed professional engineer with geotechnical and hydrogeology experience required for dewatering plan - Strict erosion control and site restoration protocols - Liquidated damages for delays - Extensive geotechnical investigations and laboratory testing inform design - No specific OEMs or vendors named; materials must meet ASTM and NCDOT standards - Project Duration: - Expected completion within 120 days from notice to proceed; final completion within 140 days - Liquidated damages of $250 per day for delays

Description

The Town of Chapel Hill is seeking a contractor to provide all materials, labor, and equipment for the Legion Pond Dam project. The work includes dewatering the existing pond, discharging water onto a rock pad to minimize erosion, using the principal outlet barrel for daily water flow, and demolishing the dam and embankment from the top down while maintaining bypass flow. Earth-moving equipment such as excavators, loaders, and dump trucks will be used. No pre-bid conference will be held, and sealed bids must be submitted by September 10, 2026, at 11:00 AM.

View original listing