Opportunity
City of Los Banos #SUB-2026-07-29-Los-Banos-PD-Gun-Range-Bid-Plans
Construction of Los Banos Police Department Gun Range (Site Work, Utilities, Modular Restroom, Shade Structure)
Posted
August 01, 2026
Respond By
September 09, 2026
Identifier
SUB-2026-07-29-Los-Banos-PD-Gun-Range-Bid-Plans
NAICS
237110, 238910, 238220, 238210
The City of Los Banos, California, is seeking bids for the construction of a new Police Department Gun Range. - Government Buyer: - City of Los Banos, Public Works Department, City Clerk - Scope of Work: - Demolition and site preparation - Grading (rough and fine) - Installation of concrete flatwork (Site Finish C: 511 units; Site Finish D: 181 units) - Installation of thick aggregate base rock (Site Finish E: 33 units) - Procurement and installation of a 16x30 shade structure - Procurement, delivery, installation, and commissioning of a 4-stall modular restroom - Installation of electrical systems improvements (utility infrastructure, new service, wiring, lighting) - Complete septic and water system improvements: - 5,000-gallon aboveground polyethylene potable water storage tank - Booster pump station, gravity sanitary sewer piping, 1,500-gallon two-compartment septic tank, effluent pump station, force main, distribution box, mounded subsurface leach field - Concrete foundation pad, seismic anchorage, water circulation mixer, float switch - Excavation, dewatering, trenching, bedding, backfill, compaction, surface restoration, startup, commissioning, permits, inspections, regulatory coordination - Temporary erosion and sediment control - Mobilization and demobilization (NTE 5%) - Bonding and general conditions (NTE 3%) - Notable Requirements: - Completion required within sixty (60) working days - Mandatory pre-bid meeting - Compliance with California prevailing wage laws - Contractor must hold a current and active California State Contractor’s License: Class A, or Class B with appropriate subcontractors - Payment and performance bonds, bid security (minimum 10% of bid amount), Department of Industrial Relations registration - One-year warranty period following acceptance - No specific OEMs or product brands are named; all products are generic or specified by function and material.
Description
The City of Los Banos is soliciting sealed bids for the construction of the Los Banos Police Department Gun Range. The project includes demolition and site preparation, concrete and aggregate base hardscape, installation of site furnishings such as a modular restroom, water tank, and shade structure, among other site work. The contract requires completion within sixty (60) working days. Bidders must attend a mandatory pre-bid meeting and comply with California prevailing wage laws and contractor registration requirements.