Culvert Installation and Repair on Saskatchewan Highways 5 and 47
Posted
August 25, 2026
Respond By
September 09, 2026
Identifier
SK-HWY-H26095-APPN
NAICS
237310, 237990
This opportunity from the Government of Saskatchewan (SaskBuilds and Procurement) seeks contractors for culvert installation and repair on Highways 5 and 47. - Government Buyer: - Government of Saskatchewan - SaskBuilds and Procurement - Scope of Work: - Installation of one 800 mm diameter polymer laminated corrugated steel pipe - Installation of three 1400 mm diameter polymer laminated corrugated steel pipes (totaling 64 meters) - Removal and disposal of 41 meters of existing culverts - Backfill repair and supply of all required materials - Estimated Material Quantities: - 505 tons of granular base course - 265 tons of asphalt concrete - 140 m³ of Riprap Type II - 145 meters of silt fence - 805 m² of erosion control blanket - 805 m² of seeding - 560 m³ of granular backfill - Contractor Responsibilities: - Supply all borrow material, granular backfill, geotextiles, riprap, sub-base, asphalt, and erosion control materials - Quantities are subject to change based on final design - OEMs and Vendors: - No specific OEMs or vendors are named in the notice - Unique Requirements: - All materials must be supplied by the contractor - Work is at multiple locations on Highways 5 and 47 - All quantities are estimates and may change
Description
This solicitation is for the procurement of a contractor to complete culvert replacements at two sites on Highway 47 between Buchanan and Preeceville, Saskatchewan, and a culvert repair on Highway 5 near Kuroki. The work includes installation of one 800 mm diameter polymer laminated corrugated steel pipe and three 1400 mm diameter pipes, along with backfill repair totaling 64 meters. The contractor is responsible for supplying borrow material, granular backfill, geotextiles, riprap, sub-base, asphalt, and erosion control materials. The work is expected to commence as early as September 2026, with completion by October 31, 2026. All quantities and project details are subject to change.