Opportunity
SAM #SP4701-26-Q-0206
Material Flow System Pilot: Procurement of Allen-Bradley Controllers, SEL Switches, Datalogic Scanners, and Belden Cable
Buyer
DLA DCSO Philadelphia
Posted
August 26, 2026
Respond By
September 07, 2026
Identifier
SP4701-26-Q-0206
NAICS
423430, 541519, 423690, 423830
The Defense Logistics Agency (DLA) Information Operations (J6) J62 IT Hardware Division is procuring equipment for the Material Flow System (MFS) pilot deployment at Red River, Texarkana, Texas. - Government Buyer: - Defense Logistics Agency (DLA), Information Operations (J6), J62 IT Hardware Division, Distribution Red River - OEMs Required: - Schweitzer Engineering Laboratories (SEL) - Rockwell Automation/Allen-Bradley - Datalogic - Belden (for cable) - Products Requested: - Rockwell Automation/Allen-Bradley ControlLogix 5590 Controllers (4 units, part number 1756-L925TS) - Allen-Bradley high performance Ethernet/IP bridge modules (9 units, part number 1756-EN2T) - Allen-Bradley 13-slot racks (3 units, part number 1756-A13) - Allen-Bradley power supplies (3 units, part number 1756-PA75) - Allen-Bradley ControlNet T-Tap (1 unit, part number 1786-TPS) - Allen-Bradley RG6 quad shield coax cable (1 unit, part number 1786-RG6) - Belden cable (100 units, part number 89463) - Allen-Bradley ControlNet 2x capacity bridge module (1 unit, part number 1756-CN2) - Schweitzer Engineering Laboratories SEL2742 Ethernet Switches (3 units, part number SEL2742) - Schweitzer Engineering Laboratories SEL2741 Ethernet Switch (1 unit, part number SEL2741) - Datalogic DX8210-2100 Standard Resolution Scanner (1 unit, part number DX8210-2100) - Unique Requirements: - Only new equipment will be accepted; refurbished equipment is not allowed - Delivery is required within 30 days after receipt of order to meet the planned MFS pilot deployment timeline - All products must be from the specified OEMs; substitutions are not permitted
Description
The Defense Logistics Agency (DLA) Information Operations (J6) J62 IT Hardware Division requests action taken to purchase Schweitzer Engineering Laboratories (SEL) network switches, Rockwell Automation/Allen-Bradley control platforms, and Datalogic industrial scanners to support the deployment of the Material Flow System (MFS) managed at Red River, Texarkana, Texas. The requested delivery date is 30 days after receipt of order, or by October 5, 2026, which is the planned go-live date for the MFS pilot deployment.