Opportunity

SAM #N0038326QAA81

Repair Services for GE Aviation PANEL, CONTROL, ELECT (P/N 712980-2, 014458474)

Buyer

NAVSUP WEAPON SYSTEMS SUPPORT

Posted

August 26, 2026

Respond By

October 26, 2026

Identifier

N0038326QAA81

NAICS

811219, 335312

This opportunity is issued by NAVSUP Weapon Systems Support (NAVSUP WSS) Philadelphia, under the Department of the Navy, for the repair of a GE Aviation PANEL, CONTROL, ELECT. - Government Buyer: - Department of the Navy - NAVSUP Weapon Systems Support (NAVSUP WSS) Philadelphia - OEM Highlight: - GE Aviation is the Original Equipment Manufacturer (OEM) for the PANEL, CONTROL, ELECT - Products/Services Requested: - Repair of PANEL, CONTROL, ELECT - Part Numbers: 712980-2 and 014458474 - No specific quantity provided - Contractor must provide all facilities, labor, materials, parts, and test equipment - Unique/Notable Requirements: - Repairs must comply with ISO 9001/SAE AS9100 quality standards - Calibration must meet ANSI/NCSL Z540.3 or equivalent - Use of MIL-W-81381 wire is prohibited; SAE-AS22759 series wire is required - Contractor must maintain configuration management and quality assurance documentation - All repairs must be performed at the specified facility - Repair process includes inspection, component repair/replacement, reassembly, and testing - Period of Performance: - Repair turnaround time: 30 days after receipt of asset - Induction expiration: 365 days after contract award - Early and incremental deliveries are accepted

Description

CONTACT INFORMATION 4 N723.18 B5W 1-771-229-3241 sara.m.weinert3.civ@us.navy.mil COMMERCIAL ITEM PROCUREMENT NOTICE - AWARD 4 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) 19 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT 8 INSPECTION AND ACCEPTANCE OF SUPPLIES 26 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) 16 INVOICE AND RECEIVING REPORT COMBO SEE SCHEDULE TBD N00383 TBD TBD NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18) 1 MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE 1 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003) 6 365 DAYS AFTER DELIVERY OF UNIT 45 DAYS FROM WHEN DEFECT WAS FOUND EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026) 4 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024) 11 SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026) 7 BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 5 BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024) 1 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026) 13 ROYALTY INFORMATION (APR 1984) 1 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008) 2 x EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEV 2026-O0028)(FEB 2026) 3 This solicitation is for the repair of the items identified herein. These items are covered against Basic Ordering Agreement (BOA) N00383-25-G-AQ01: Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Required RTAT: 030 days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for Each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under this contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. All contractual documents (i.e., contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted. All Terms and Conditions are in accordance with BOA: N00383-25-G-AQ01. 1. Scope 1.1 Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested, and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as required by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. Applicable Documents - Not Applicable 3. Requirements 3.1 1.0 General This Statement of Work (SOW) establishes the criteria for repair and testing/inspection of the subject item. It includes inspection, component repair and replacement, reassembly, and testing procedures required to return units back into a serviceable condition. 3.2 2.0 Definitions Contractor: Is defined as the successful offeror awarded a contract, order, or issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. Overhaul: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual), reassembled, and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). Repair: A repaired part is one which has been restored to a Ready for Issue (RFI) condition (by replacing or repairing those components found to be defective, broken, damaged, or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 Scope General: The items to be furnished hereunder shall be overhauled, upgraded, repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided, Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. Repair Upgrade Requirements: The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the following items to a Ready For Issue (RFI) condition: PANEL, CONTROL, ELECT; 712980-2; P/N; 014458474; NSN; IAW Applicable Manuals; Tech Publications RFI Definition: RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). Changes to Manuals, Drawings, or Specifications: Changes require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Repair, test, and inspection should not extend beyond the requirements of this paragraph unless authorized by the Government QAR. Requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. Unapproved Changes: Repairs using unapproved changes are at the contractor's own risk. If disapproved, the contractor shall replace any delivered items repaired using such unapproved manuals, drawings, specifications, or repair sources or facilities. The contractor is not entitled to any adjustment based on the disapproval. References on Drawings and Specifications: For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" shall be read as the "Government Designated Agency". Process Control Documentation: The contractor shall prepare and maintain repair procedures and test/inspection information which shall be made available to the Government for review and approval. Procedures shall include sequential process diagrams and performance specifications. These processes shall be frozen after approval. Beyond Economical Repair (BER): An item is BER if the repair cost exceeds 75% of the current replacement price at the time of award. Such items are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units deemed BER. Documentation shall be provided to the PCO for disposition instructions. Missing on Induction (MOI): A Weapons Repairable Assembly (WRA) is MOI if received missing one or more Shop Replaceable Assemblies (SRAs). The contractor shall notify DCMA immediately and obtain verification for all WRAs with MOI SRAs. Induction and repair shall not proceed until instructions are received. Replacing Failed or Missing SRA: When an SRA within a WRA is deemed beyond repair or missing, the contractor shall seek verification from DCMA and advice from the Inventory Manager on replacement options, including shipping in place or obtaining new SRA(s). Over and Above Repair (OAR): An item requiring repair beyond normal scope or scope not included in the contract pricing is considered OAR. The contractor shall obtain DCMA concurrence before proceeding with OAR repairs. 4. Parts and Materials 4.1 General The contractor is responsible for supplying all parts and materials necessary unless specifically identified as Government Furnished Material (GFM). All parts and materials shall comply with the latest approved drawings and specifications and be new, unless approved otherwise by the PCO. Cannibalization must be approved by the PCO. 4.2 Access to Drawings and Specifications The contractor shall have access to updated drawings and specifications for parts and materials for the duration of the contract. Changes require Government approval unless the contractor is the Design Control Agent (DCA). Repairs using unapproved changes are at the contractor's risk, and replacements shall be made if disapproved. 4.3 Purchased Material Control and Inspection The contractor shall control purchased parts and materials, ensuring compliance with contract requirements. Inspection upon receipt shall be documented, including dimensional data, material, finish, and process data. 4.4 Part Cannibalization Part cannibalization is not authorized unless specifically approved by NAVSUP WSS and the BDE. 4.5 Source and Location of Repair Source The contractor shall specify the name and location of the source/division performing the work. Inspection will be on the contractor's equipment. 5. Contractor Quality Requirements 5.1 Quality Program The contractor shall establish and maintain a quality system conforming to ISO 9001/SAE AS9100, designed to detect, correct, and prevent quality issues. 5.2 Calibration System The contractor shall maintain a calibration system meeting ANSI/NCSL Z540.3, ISO-10012-1, or equivalent. 6. Configuration Management (CM) 6.1 The contractor shall maintain a configuration management plan in accordance with NAVSUP WSS clause NAVICPIA18. 7. Markings 7.1 Markings shall be as indicated in the contract when applicable. 8. Storage 8.1 The contractor shall provide proper enclosed storage for both awaiting repair and repaired assets to prevent damage. A quality control system meeting Mil-I-45208A, Mil-Q 9858, ISO 9000/9001/9002 or equivalent shall be maintained. 8.2 Inspection Responsibility The contractor is responsible for all inspection requirements unless otherwise specified. Inspection procedures shall be prepared and maintained for review and approval, including sequential diagrams and performance specifications. 8.3 Quality Assurance Program The contractor shall develop and maintain a Repair Quality Plan in accordance with Mil-I-45208A, Mil-Q 9858, ISO 9000/9001/9002, or equivalent, to ensure compliance with contractual requirements. 8.4 Purchased Material Control The contractor shall control purchased materials, ensuring compliance with contract requirements, and maintain inspection records for at least twelve months after acceptance. 8.5 Failure Analysis and Corrective Action All failure analysis and corrective action reports shall be submitted to the Government. 8.6 Nonconforming Material The contractor shall control nonconforming material, including procedures for identification, segregation, and disposition. 8.7 Internal Review and Material Review Boards IRB authority is delegated to the contractor for minor non-conformances. The Material Review Board (MRB) retains authority for "AS-IS" and minor non-conformances, with requests for variance submitted via the DCMC. 8.8 Compliance Responsibility All items must meet all requirements of this Statement of Work. Inspection requirements are part of the overall quality system. Submission of defective items is not authorized. 8.9 Repair Assessment Testing The Government may select samples for performance, environmental, and quality conformance testing. Records shall be maintained for each CLIN and assembly, including inspection, repair, parts replacement, and test data. 8.10 Records of Data Collection The contractor shall maintain a historical record file for each CLIN, including inspection documentation, repair records, parts inspection data, and acceptance test data, available to the Government upon request. 9. Packaging 9.1 Packaging shall comply with MIL-STD 2073 as specified elsewhere in the schedule. 10. Notes Not applicable. Additional Links: See Solicitation N0038326QAA81

View original listing