Opportunity

City of Bluffs Ionwave #PURCH - 2026 - 51

Construction of Recreation Complex Storage Building for City of Council Bluffs

Posted

August 25, 2026

Respond By

September 15, 2026

Identifier

PURCH - 2026 - 51

NAICS

236220, 238190

The City of Council Bluffs Purchasing department is seeking bids for the construction of a non-conditioned dry material storage building at the Recreation Complex. - Government Buyer: - City of Council Bluffs, Purchasing department - Scope of Work: - Construction of a storage building on an existing Phase I concrete foundation and floor slab - Includes CMU veneer walls and piers, masonry reinforcement, dowels, sealant, caps, water-repellent treatment - Roof trusses, wood framing, fascia, cedar soffits, standing-seam metal roofing, gutters, and downspouts - Insulated steel overhead doors, insulated hollow-metal personnel door and frame with hardware - Steel bollards, structural steel at openings, and all related accessories - Products/Services Requested: - Lump sum base bid for complete construction as described - No specific part numbers or OEMs provided - Unique Requirements: - Building must be constructed on existing foundation (Phase I footings and slab excluded except for necessary connections) - Completion required by June 1, 2027, with preference for December 31, 2026 - Electronic bid submission via IonWave - 10% bid security, performance and payment bonds, insurance, and EEO compliance certificates required - OEMs and Vendors: - No specific OEMs or vendors mentioned; open to all qualified contractors - Quantities: - Single lump sum bid for the entire project

Description

The City of Council Bluffs is requesting bids for the construction of a non-conditioned dry material storage building on the existing Phase I concrete foundation and floor slab. The scope includes CMU veneer walls and piers, masonry reinforcement, dowels, sealant, caps, water-repellent treatment, roof trusses, wood framing, fascia, cedar soffits, standing-seam metal roofing, gutters, downspouts, insulated steel overhead doors, insulated hollow-metal personnel door and frame with hardware, steel bollards, structural steel at openings, and all related accessories. The Phase I footings and slab are existing and not included in the bid scope except for connections. The project must be completed on or before June 1, 2027, with a preference for completion by December 31, 2026. Bids must be submitted electronically via IonWave by the deadline and include a 10% bid security and performance bonds.

View original listing