Opportunity

SAM #W519TC-26-R-A072

Utility Installation for RV Campground Site at Rock Island Arsenal

Buyer

W6QK ACC-RI

Posted

August 24, 2026

Respond By

September 15, 2026

Identifier

W519TC-26-R-A072

NAICS

237130, 237110

This opportunity from the U.S. Army Garrison Rock Island Arsenal seeks contractors to install utilities for a new RV Campground Site. - Government Buyer: - U.S. Army Garrison Rock Island Arsenal, Directorate of Public Works, Engineering and Services Division - U.S. Army Contracting Command - Rock Island (ACC-RI) - Products Requested: - Water utility: 8-inch HDPE water main (approx. 543.6 LF), fire hydrant, main valves, water meter (Elster C3000 bronze low lead NSF 61), water main cap - Gas utility: 1-inch poly gas line (approx. 660.3 LF), gas valve, gas meter, isolation valve - Electrical utility: Overhead 13.8 KV power feed, new electrical power poles (Types A, B, C), pad-mounted oil-filled transformer (500 KVA and 750 KVA), fusible cutoff switch, overhead 15 KV power cables (3x1/0 AWG copper and ACSR), junction box, conduits - Additional: Ductile iron pipe and fittings, gate valves, dry-barrel fire hydrants, water meters and vaults, polyethylene pipe fittings, pipe restraint devices, tapping sleeves, sleeve-type mechanical couplings, insulating joints, dielectric fittings, gas valves and regulators, valve boxes, warning tapes, wood poles, composite crossarms, overhead conductors, medium voltage cable and accessories - Services Requested: - Complete installation of utilities (water, gas, electrical) including trenching, directional drilling, backfilling, hydroseeding, site restoration, removal of saplings, and compliance with Iowa SUDAS 2026 standards - Excavation, repair, and restoration of disturbed areas - Qualified personnel, safety and quality control plans, compliance with environmental, safety, and security requirements - Unique/Notable Requirements: - Compliance with Iowa State Urban Design and Specifications Program (SUDAS) 2026 - Liquidated damages of $1,000 per day for delays beyond 180 working days - 100% Small Business Set-Aside under NAICS 237110 - Firm-fixed-price contract with unit pricing for rock excavation and granular stabilization - All technical details, specifications, and requirements are detailed in attachments - OEMs Mentioned: - Elster (water meter) - Quantities: - 543.6 LF of 8-inch HDPE water main, 660.3 LF of 1-inch poly gas line, multiple valves, hydrant service, electrical poles, transformers, cables, and other components - Period of Performance: - Work must commence within 45 working days after notice to proceed and be completed within 180 working days - Liquidated damages apply for delays - Estimated Contract Value: - Likely in the range of $500,000 to $2,000,000 based on scope and typical utility installation costs

Description

The Army Contracting Command - Rock Island (ACC-RI) requests a proposal for the Install of Utilities for the RV Campground Site located on the Rock Island Arsenal, Rock Island, Illinois. See attachments for details.

View original listing