Opportunity

Riverside Community College District Planet bids #145200

Riverside City College HVAC Controls and Mechanical System Upgrade – Quadrangle Building

Posted

August 24, 2026

Respond By

September 28, 2026

Identifier

145200

NAICS

238220, 221330

Riverside City College is seeking bids for a comprehensive upgrade of the HVAC controls and mechanical systems in the Quadrangle Building. - Government Buyer: - Riverside City College, part of Riverside Community College District - OEMs and Vendors: - Automated Logic Controls (ALC) specified for building automation system - Belimo (or approved equal) for temperature control valves - Bell & Gossett (or approved equal) for circuit balancing and triple duty valves - Products/Services Requested: - Complete replacement of the existing Trane temperature control system with Automated Logic Controls (ALC) BAS - New 3-way chilled water and heating hot water temperature control valves with actuators (Belimo or equal) - Circuit balancing valves and triple duty valves (Bell & Gossett or equal) - Stainless steel 40 mesh screens for strainers - New thermostats with integrated CO2 sensors (set at 900 ppm) - System cleaning, chemical treatment, and testing, adjusting, and balancing (TAB) of hydronic HVAC systems - Unique/Notable Requirements: - All work must comply with California Building Codes, Title 24, and Division of State Architect approval - Project includes installation of access doors/panels for maintenance - $25,000 allowance to be included in base bid - 10% bid bond required (electronic and hard copy with wet signatures) - Project duration is 120 days with liquidated damages at $250 per day - Open to contractors with a California B license - Integration of new thermostats with BAS and CO2 monitoring - System cleaning and chemical treatment required after valve and piping modifications

Description

This project involves the complete replacement of the HVAC energy management system and controls for Riverside City College's Quadrangle Building with Automated Logic Controls. The scope includes installation according to provided specifications and drawings. Bidders must submit a 10% bid bond both electronically and as a hard copy with wet signatures. An additional $25,000 allowance should be added to the base bid. The project duration is 120 days with liquidated damages set at $250 per day.

View original listing