Opportunity

North Carolina eVP #98-26-015

Beam Administration Building HVAC Redesign and Installation for Gaston College

Posted

August 24, 2026

Respond By

September 17, 2026

Identifier

98-26-015

NAICS

238220, 238210

Gaston College in Dallas, North Carolina is seeking bids for the redesign and installation of new heating and air handling systems in the Beam Administration Building. - Government Buyer: - Gaston College (Dallas Campus), State of North Carolina - OEMs and Vendors: - Laars (NeoTherm XTR condensing boiler) - Daikin (CAH026GMCM air handler) - Bell & Gossett (AX-10-DD pump and expansion tank) - Spirotherm (VDT200 air and dirt separator) - AtmosAir (508FC ion generating air purifier) - Eaton (VFD-1 variable frequency drive) - Products/Services Requested: - Removal of existing steam heating system - Installation of hot water heating system - 1 Laars NeoTherm XTR condensing boiler (500 MBH input) - 1 Daikin CAH026GMCM air handler (12,100 CFM supply) - 1 Bell & Gossett AX-10-DD hot water pump - 1 Spirotherm VDT200 air-dirt separator - 1 AtmosAir 508FC ion generating air purifier - 1 Eaton VFD-1 variable frequency drive (1.5 HP) - Associated piping, ductwork, controls, and electrical work - Daily cleanup, damage repair, OSHA-compliant air testing, and training for maintenance staff - Unique/Notable Requirements: - All work must comply with 2018 North Carolina Building Code and relevant mechanical, electrical, and gas codes - Proper contractor licensing under North Carolina law required - Mandatory pre-bid conference attendance - Sealed bids only; electronic bids not permitted - Work to be completed during normal business hours; time extensions possible for uncontrollable delays - Training and walk-through for facilities maintenance personnel - Engineering services by AeroRaq Engineering Inc for design and installation - Inspections coordinated with Gaston County authorities

Description

This solicitation is for the provision and installation of mechanical, electrical, and plumbing equipment in the Beam Administration building at Gaston College. The project involves removing the existing steam powered heating system and replacing it with a hot water heating system. The air handler will be replaced, and air purifiers will be installed on the air handler. The work includes installation of one condensing boiler, primary pumps, a new air and dirt separator, ion generating air purifiers, and an air handler, along with daily cleanup and training for facilities maintenance personnel.

View original listing