Opportunity
City of Norwalk PlanetBids #IFB No. 27-874
Norwalk Streets Rehabilitation Project: Excelsior Drive, Front Street, and Foster Road
Posted
August 21, 2026
Respond By
September 04, 2026
Identifier
IFB No. 27-874
NAICS
237310, 237990, 238990
The City of Norwalk is seeking bids for a major streets rehabilitation project covering Excelsior Drive, Front Street, and Foster Road. - Government Buyer: - City of Norwalk Engineering Department - Contact: Albert Mendoza, P.E., City Engineer - Scope of Work: - Cold milling and micro-grinding of existing asphalt concrete pavement (over 350,000 SF total) - Removal and reconstruction of asphalt concrete (AC) and Portland cement concrete (PCC) surfaces - Installation of Asphalt Rubber Hot Mix (ARHM GG-C) overlays (over 4,000 tons total) - Slurry seal application, crack filling, and skin patching - Curb and gutter, sidewalk, and ADA curb ramp reconstruction (over 5,000 SF sidewalk, 19 curb ramps) - Utility adjustments (manholes, valve lids, storm drains, pullboxes) - Traffic loop detector replacement, pavement marking, striping, and channelizer installation - Tree removal, installation of rubber wheel stops, and curb painting - Products/Materials Requested: - ARHM GG-C asphalt rubber hot mix - Portland cement concrete - Decomposed granite - Rubber wheel stops, channelizers, blue reflective raised pavement markers - Quantities: - 152,000 SF cold milling (2-inch depth) - 1,840 tons ARHM overlay (2-inch thick) - 3,605 SF PCC sidewalk reconstruction - 17 standard curb ramps, 2 modified curb ramps - 120 tons slurry seal - 7 tree removals (up to 36-inch diameter) - Unique Requirements: - Strict adherence to contract documents, permits, and regulations - Construction window limited to May 1 through September 30; no work on weekends, holidays, or during school sessions unless authorized - Liquidated damages of $2,000 per calendar day for delays - Coordination with Southern California Edison for pole work - Estimated Contract Value: - Approximately $2,400,000 - Notable Vendors Mentioned: - Excel Paving Company - MAJ Engineering - Marina Landscape Inc. - Pavement Recycling Systems - R.J. Noble Company - Riverside Slurry Seal Inc. - Towo Enterprise Inc.
Description
The project involves furnishing all necessary labor, materials, equipment, and incidental work to complete streets rehabilitation as described in the contract documents. Work includes cold milling existing asphalt concrete pavement, removals and reconstructions, overlays, utility adjustments, signing, striping, traffic control, removal and replacement of cross gutters and spandrels, curb and gutter, sidewalk, ADA curb ramps, and related work. All work must conform to contract documents, permits, and regulations. The estimated cost of the project is approximately $2,400,000. Bids are to be submitted electronically via the City of Norwalk's PlanetBids portal.